Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-10-02 Design, Permitting, Fabrication and Inst. of Barrier at Heritage
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2011 11:59:58 AM
Creation date
11/15/2011 11:59:47 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Design Aluminum Security Barrier
Bid No. (xx-xx-xx)
11-10-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />7.1.3 Any successful bidder which is a corporation organized'in a state other than Florida or <br />any bidder doing business in the State of Florida under a fictitious name shall furnish, at <br />no cost to the City, no later than the time at which the executed Contract for Construction, <br />the Payment Bond, and the Performance Bond are returned, a properly certified copy of <br />its current Certificate of Authority and License to do business in the State of Florida. No <br />contract will be executed by the City until such certifica:e is furnished by the bidder. <br />7.1.4 Within fifteen (15) calendar days of the issuance of a Notice to Proceed, the Contractor <br />shall submit one (1) signed copy of the following instruments. No payment will be <br />processed until all of these instruments are received, and approved by the City's <br />Representative. <br /> <br />· Construction Schedule <br />. Contractor's Schedule of Values <br />· List of material suppliers <br />. Itemized breakdown of anticipated equipment rates. Overhead and profit shall not be <br />included. <br /> <br />7.2 Contract Sum <br /> <br />7.2.1 The City shall compensate Contractor for all Work described herein and in the Contract <br />Documents the Contract Sum set forth in the Contract for Construction, subject to <br />additions and deletions as provided in the Contract. <br /> <br />7.3 Schedule of Values <br /> <br />7.3.1 Within fifteen (15) days after receipt of the Notice to Proceed, the Contractor shall submit <br />to the City's Representative a revised schedule of values allocated to various portions of <br />the Work, prepared in such form and supported by suci, data to substantiate its accuracy <br />as the City's Representative may require. The schedule of values MUST be approved by <br />the City. This schedule, unless objected to by the CitY':3 Representative, shall be used as <br />a basis for reviewing the Contractor's Applications for Payment. The values set forth in <br />such schedule shall not be used in any manner as fixing a basis for additions to or <br />deletions from the Contract Sum. The Schedule of Values is strictly for payment <br />allocation and shall not be used to establish prices. <br /> <br />7.4 Applications for Payment <br /> <br />7.4.1 Progress payments shall be made on account of materials and equipment delivered to <br />the site and incorporated in the Work. No payments will be made for materials and <br />equipment stored at the Project site but not yet incorporated into the Work. <br /> <br />7.4.2 If approved in writing and in advance by City, progress payments may be made on <br />account of materials and equipment delivered and suitably stored at the site for <br />subsequent incorporation in the Work. City may in its sole discretion refuse to grant <br />approval for payments for materials and equipment stored at the Project site but not yet <br />incorporated in the Work. Any approval by City for payment for materials and equipment <br />delivered and suitably stored at the site for subsequent incorporation in the Work shall be <br />conditioned upon Contractor's demonstrating that such materials and equipment are <br />adequately protected from weather, damage, vandalism and theft and that such materials <br />and equipment have been inventoried and stored in accordance with procedures <br />established by or approved by the City. Nothing in this clause shall imply or create any <br />liability on the part of the City for the Contractor's inventory and storage procedures or for <br />any loss or damage to material, equipment or supplies stored on the site, whether <br />incorporated into the work or not. In the event any ~:Juch loss or damage occurs, the <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.