Laserfiche WebLink
<br />~=~ <br /> <br />Kimley-Horn <br />and Associates, Inc. <br /> <br />Mr. Giovanni Batista, RK Village Plaza, December 12,2011 Page 2 <br /> <br />serVIces. <br />. Site plan modification and platting are not required. <br />· The Client will supply information relevant to proof of ownership of the property, <br />., Existing utilities will be impacted by the construction, including a fire hydrant, water service, and <br />site and roadway lighting. KHA will obtain readily available information on the utilities affected <br />and design and permit relocations. <br />., This project will require a plan review with the Miami Dade County Department of <br />Environmental Resources Management. <br />· Lighting plans (if required) will be provided by the Client's electrical engineer and incorporated <br />into the engineering plans for coordination purposes only, <br />. KHA may require soft-digs to be performed along Collins Avenue at the proposed relocated <br />driveway location. This Scope of Services does not include the performance of soft-digs. The <br />responsibility for scheduling, performing, and the cost of soft-digs shall be the responsibility of <br />the Client. KHA will identify the locations. The results of the soft-dig shall be surveyed and <br />provided to KHA. <br />. The project will be permitted and constructed in one phase, <br />e There are no wetlands or species of concern in the project area given. <br />fl Water use permitting for dewatering or irrigation is not included. <br />fl Specialty paving systems, hardscape, and decorative site amenities are not anticipated for the <br />project and are not included in this scope of work. <br />fl The Client is responsible for coordinating construction bidding of the project. KHA will provide a <br />PDF to the Client to produce necessary bid sets, answer reasonable requests for information, and <br />issue addenda during bidding related to the site development. <br />., Filing of a National Pollutant Discharge Elimination System (NPDES) Notice of Intent is not <br />anticipated as the expected project area is less than one (1) acre, <br />fl All permit, application, and/or impact fees will be paid directly by the Client. <br />· ADA certification is not included, <br />· This scope of services and fee proposal anticipates that all design and permitting services will be <br />complete within six (6) months following notice to proceed, Construction phase services shall be <br />completed within six (6) months following commencement of construction, No more than thirty <br />(30) days will elapse between tasks, <br /> <br />SCOPE OF SERVICES <br /> <br />Task 1 - Data Collection / Survey <br /> <br />KHA will subcontract with a professional land surveyor to obtaining a site survey to collect the necessary <br />data for design, The surveyor will provide KHA with a drawing in AutoCAD 2007 format. The survey, to <br />be provided by the surveyor, shall include all information necessary for the driveway and parking lot <br />modifications, including existing parking stall locations, landscape islands, landscaping, drainage <br />structures, the location of underground and overhead utilities, topographic elevations, buildings and other <br />structures, and lighting structures, The survey will include topographic data at sufficient density to <br />characterize the site grades and will be referenced to an established datum with identified local <br />benchmarks. KHA will use the electronic survey file to develop a base map from which the parking lot <br />modifications will be designed. KHA will visit the site to review existing conditions, identify existing <br />observable elements that may affect the design, and to photograph areas of interest. KHA will obtain <br />roadway record surveys, if available, from the appropriate agencies. If no record information is available, <br />additional survey may be required. <br /> <br />8113 <br />