My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Radio satellite Integrators, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-12-01 Fleet Wide Remote Mgmt. System
>
Responses
>
Radio satellite Integrators, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:16:07 AM
Creation date
1/9/2012 4:21:24 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Fllet wide
Bid No. (xx-xx-xx)
11-12-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Radio City of Sunny Isles Beach <br />RFP# 11 -12 -01 <br />7 Satellite Fleet Wide Remote Management System = <br />1 t �� l s, Inc. January 4, 2012 <br />Training <br />RSI Training Methodology <br />RSI will provide live training sessions on the entire AVL system sufficient to ensure complete <br />understanding and operations proficiency by the desired client staff and administrative personnel. <br />The client will receive training to be provided to the entire staff exposed to the system, with an <br />intensive "train- the - trainer" approach for selected personnel in order to maximize long -term <br />worker productivity. The training sessions shall be held at locations specified by the client for <br />administrative, driver, dispatch, executive, maintenance, and all other relevant parties. All <br />materials and manuals will be provided in both printed and electronic format. <br />Training Program Overview <br />RSI and the other team members will work with the customer's team to define the required <br />courses and a reasonable number of attendees /course duration during the implementation phase <br />of the project. <br />Train-The-Trainer Training <br />• On -Site <br />• Hands -On <br />• Users & Administration <br />Project Book <br />& Solution Documentation <br />• User Guide <br />• System Admin Guide <br />• Production Architecture Spec, <br />Daily <br />System Health Check <br />& Prelim. Validation <br />1_42,_ <br />• Training Matenals ,W �¢ <br />• Project Activities Log -F <br />Ala Uhl <br />r <br />Mondily Report <br />Radio Satellite Integrators, Inc. <br />CONFIDENTIAL <br />45 <br />Help Desk Support <br />Multi -Level <br />8x5; 12x5; 24x7 <br />Field Support) <br />Critical Trouble <br />Shooting <br />
The URL can be used to link to this page
Your browser does not support the video tag.