My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendums
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-02-02 Public Relations Services
>
Addendums
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 8:47:31 PM
Creation date
1/10/2012 2:34:07 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Addendum
Bid No. (xx-xx-xx)
11-12-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ell Of SUN f��o <br />of the Tony Romas landscaping. All maintenance shall comply with the <br />requirements of the applicable specifications above and with specification L. and <br />others as required. <br />TREE TRIMMING (refer to Section L. for additional information): <br />Palm frond and palm fruit (i.e. coconuts, dates, etc..) trimming (2 to 9) shall be <br />provided every 3 months beginning on the second month of contract execution <br />between the City and the successful vendor. Trimming services shall be included <br />in the cost of maintenance for PARKS, R.O.W., Beach Accesses, Parking Lots, <br />Government Facilities, and other places where the need exists. Vendor shall take <br />note that dead fronds or hanging fronds shall be removed once observed as part <br />of the daily maintenance. <br />3.12 K. MISCELLANEOUS ITEMS (see attached man for locations) <br />K1. This proposal item is to include the supplying of all necessary materials, supplies, labor, <br />equipment, fuel, and other miscellaneous necessities to properly and legally dispose of <br />any dead animals located within the City limits, when requested to do so by the City. <br />The animal must be removed within six hours of the request if the request is made <br />between 5:00pm and 7:00am, and within two hours if the request is made between <br />7:00am and 5:00pm. Though these are the maximum times allowed to respond, it is <br />intended that the Proposers will always respond immediately. <br />In areas of traffic, the proposal will include all appropriate traffic control devices that <br />conform to an approved Maintenance of Traffic (MOT) plan. All traffic control costs shall <br />be a part of the unit price proposal and shall not be paid for separately. <br />K2. This proposal item is to include the supplying of all necessary materials, supplies, labor, <br />equipment, fuel, and other miscellaneous necessities to and properly maintain the clay <br />infield on the baseball diamond at Pelican Community Park. This will include dragging <br />the field, servicing the pitcher's mound, and replacing any materials necessary to have an <br />excellent playing surface. <br />K3. This proposal item is to include the supplying of all necessary materials, supplies, labor, <br />equipment, fuel, and other miscellaneous necessities to stripe the baseball field in Pelican <br />Community Park. This shall include the foul lines (to the outfield fence) and all <br />accompanying areas, using chalk powder, the striping shall be done to industry standards <br />and shall follow the recommendations of the manufacturer. <br />K4. This proposal item is to include the supplying of all necessary materials, supplies, labor, <br />equipment, fuel, and other miscellaneous necessities to properly stripe the soccer field at <br />Gwen Margolis Park. This will require striping all lines necessary to provide an <br />appropriate regulation field, using paint. The striping shall be done to industry standards <br />and shall follow the recommendations of the manufacturer. <br />City of Sunny Isles Beach I Request for Proposal No. 11 -12 -02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.