My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bid No. 16-12-02 - New HVAC Chiller Systems for Pelican Community Park
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(16-12-02) HVAC Chiller Systems for Pelican Community Park
>
Bid No. 16-12-02 - New HVAC Chiller Systems for Pelican Community Park
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2017 4:26:01 PM
Creation date
2/15/2017 4:21:40 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
New HVAC Chiller Systems for PCP
Bid No. (xx-xx-xx)
16-12-02
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 13 <br /> <br />Liquidated damages and costs incurred by City and/or Consultant for extended construction <br />administration. <br />Failure of Contractor to provide any and all documents required by the Contract Documents. <br /> <br />2.10 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE CONTRACTOR <br /> <br />Unless otherwise provided in Section 3 of this solicitation the Contractor shall furnish the following, <br />including but not limited to, all labor, materi al, equipment, barricading, Maintenance of Traffic <br />(MOT) inclusive of any required off duty police officers, adequate supervision, and coordination for <br />satisfactory contract performance. When not specifically identified in the technical specifications, <br />such materials and equipment shall be of a suitable type and grade for the purpose and meeting <br />or exceeding all permit or industry standard requirements. All material, workmanship, 100% <br />design, testing and equipment shall be subject to the inspection and approval of the City Manager <br />or his designated representative for this project. <br /> <br />2.11 CLEAN-UP <br /> <br />All unusable materials and debris shall be removed from the premises at the end of each <br />workday, and disposed of in an appropriate manner. No equipment, material, debris, trailers or <br />other items may be stored in any location outside of the provided constr uction easements <br />without written approval from the City and the property owner. Upon final completion, the <br />Contractor shall thoroughly clean up all areas where work has been involved as mutually agreed <br />with the City. <br /> <br />2.12 FEDERAL, STATE AND LOCAL REGULATIONS <br />The successful Bidder shall comply with all federal, state and local ordinances, regulations, rules <br />and permits as well as any other laws that would apply to the services being provided. The Bidder’s <br />costs associated with regulatory requirements shall be included in the bid whether depicted <br />specifically or not within the body of the ITB. <br /> <br />2.13 MATERIALS SHALL BE NEW AND WARRANTED AGAINST DEFECTS <br />The Bidder hereby acknowledges and agrees that all materials, except where recycled content is <br />specifically requested, supplied by the Bidder in conjunction with this solicitation and resultant <br />contract shall be new, warranted for their merchantability, and fit for a particular purpose. In the <br />event any of the materials supplied to the City by the Contractor are found to be defective or do <br />not conform to specifications: (1) the materials may be returned to the Contractor at the <br />Contractor’s expense and the contract cancelled or (2) the City may require the Contractor to <br />replace the materials at the Contractor’s expense. No provisions or allotments for delays or time <br />extensions to the schedule as a result of “defective”, unacceptable material, or reused material <br />found shall be granted. <br /> <br />In the event that material is suspected by the City of being reused or not new in original packaging, <br />the material may be rejected. The Contractor shall remove such material and replace it at his/her <br />cost and within the original schedule. No provisions or allotments for delays or time extensions to
The URL can be used to link to this page
Your browser does not support the video tag.