Laserfiche WebLink
<br />City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 13 <br /> <br />Liquidated damages and costs incurred by City and/or Consultant for extended construction <br />administration. <br />Failure of Contractor to provide any and all documents required by the Contract Documents. <br /> <br />2.10 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE CONTRACTOR <br /> <br />Unless otherwise provided in Section 3 of this solicitation the Contractor shall furnish the following, <br />including but not limited to, all labor, materi al, equipment, barricading, Maintenance of Traffic <br />(MOT) inclusive of any required off duty police officers, adequate supervision, and coordination for <br />satisfactory contract performance. When not specifically identified in the technical specifications, <br />such materials and equipment shall be of a suitable type and grade for the purpose and meeting <br />or exceeding all permit or industry standard requirements. All material, workmanship, 100% <br />design, testing and equipment shall be subject to the inspection and approval of the City Manager <br />or his designated representative for this project. <br /> <br />2.11 CLEAN-UP <br /> <br />All unusable materials and debris shall be removed from the premises at the end of each <br />workday, and disposed of in an appropriate manner. No equipment, material, debris, trailers or <br />other items may be stored in any location outside of the provided constr uction easements <br />without written approval from the City and the property owner. Upon final completion, the <br />Contractor shall thoroughly clean up all areas where work has been involved as mutually agreed <br />with the City. <br /> <br />2.12 FEDERAL, STATE AND LOCAL REGULATIONS <br />The successful Bidder shall comply with all federal, state and local ordinances, regulations, rules <br />and permits as well as any other laws that would apply to the services being provided. The Bidder’s <br />costs associated with regulatory requirements shall be included in the bid whether depicted <br />specifically or not within the body of the ITB. <br /> <br />2.13 MATERIALS SHALL BE NEW AND WARRANTED AGAINST DEFECTS <br />The Bidder hereby acknowledges and agrees that all materials, except where recycled content is <br />specifically requested, supplied by the Bidder in conjunction with this solicitation and resultant <br />contract shall be new, warranted for their merchantability, and fit for a particular purpose. In the <br />event any of the materials supplied to the City by the Contractor are found to be defective or do <br />not conform to specifications: (1) the materials may be returned to the Contractor at the <br />Contractor’s expense and the contract cancelled or (2) the City may require the Contractor to <br />replace the materials at the Contractor’s expense. No provisions or allotments for delays or time <br />extensions to the schedule as a result of “defective”, unacceptable material, or reused material <br />found shall be granted. <br /> <br />In the event that material is suspected by the City of being reused or not new in original packaging, <br />the material may be rejected. The Contractor shall remove such material and replace it at his/her <br />cost and within the original schedule. No provisions or allotments for delays or time extensions to