Laserfiche WebLink
<br />City of Sunny Isles Beach | Invitation to Bid No. 16-12-02 14 <br /> <br />the schedule as a result of “defective”, unacceptable material, or reused material found shall be <br />granted. <br /> <br />2.14 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A NOTICE TO <br />PROCEED <br />The Contractor shall neither commence any work, nor enter a City work premise, until a written <br />Notice to Proceed (NTP) directing the Contractor to proceed with the work has been received by <br />the Contractor from the City Manager or his designee representative; provided however, that such <br />notification shall be superseded by any emergency work that may be required in accordance with <br />provisions included elsewhere in this solicitation and resultant contract. In addition to the written <br />NTP, the Contractor must supply the City with the required insurance and bond documents. <br /> <br />2.15 ACCIDENT PREVENTION AND BARRICADES <br />Barricades, cones, construction fencing, temporary construction fencing and off duty police officers, <br />per City regulations and other relevant requirements, shall be pro vided by the Contractor when <br />work is performed in areas traversed by persons, vehicular traffic or when deemed necessary by <br />the City Manager or his designee at no extra cost to the City. CONTINUOUS OFF-DUTY POLICE <br />SUPPORT SHALL BE REQUIRED FOR ALL WORK RESULTING IN MODIFICATIONS TO THE <br />EXISTING TRAFFIC FLOW PATTERNS INCLUDING BUT NOT LIMITED TO LANE CLOSURES AND <br />DETOURS OR WHERE OTHERWISE REQUESTED BY THE CITY. <br /> <br />Contractor shall comply with City, State and Federal regulations and permit requirements for the <br />placement of the proper Traffic Control Devices. Precautions shall be exercised at all times for the <br />protection of persons and property. All services performed under this contract shall conform to all <br />relevant regulations as prescribed in the current edition of the Manual of Uniform Traffic Control <br />Devices (MUTCD), the Florida Department of Transportation’s Design Standards (DS) and OSHA <br />during the course of such effort. Where requirements vary or conflict, the more stringent shall <br />apply. Any fines levied by the above mentioned authorities for failure to comply with these <br />requirements shall be borne solely by the Contractor. <br /> <br />2.16 DELIVERY & PROTECTION OF MATERIAL AND EQUIPMENT <br /> <br />All material must be F.O.B. delivered. The Contractor is solely liable and responsible for the <br />purchase, delivery, and installation of all materials and equipment. The contractor will make all <br />arrangements for delivery. Contractor will be solely liable for receiving, inspecting, accepting, and <br />replacing any damaged materials or equipment and filing any and all claim with suppliers or <br />transporters. Contractor is responsible for the protection of all materials and equipment from <br />adverse weather conditions, damage, deterioration, and theft until the Work has been acce pted <br />by the City. <br /> <br /> <br /> <br /> <br /> <br />