My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-11-03 Collins Avenue Streetscape
>
Addendum 2
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 8:11:28 PM
Creation date
1/11/2012 3:33:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Streetscape
Bid No. (xx-xx-xx)
11-11-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. How are you going to handle the closing of sidewalks? <br />The closing of sidewalks are based on FDOT standards, and so what you are going to <br />need is a Sidewalk Closed Sign on the north and south (before and after) and closest to <br />the intersection that you are not impacting so people can cross the other way. We are <br />going to be doing it by block, and so when you close off a block and you bring in the <br />dump you are going to be doing the lane closure. You do need two Lane Closure <br />Permits, one for FDOT and one for the City. You are going to be required to get an off - <br />duty police officer, and that is coordinated by you all with the City of Sunny Isles <br />Beach. <br />6. Do we pay for the permits? <br />Yes, in the body of the RFP, and everything is in there, this is all inclusive, so make sure <br />you include every cost and every price that you can imagine as part of this bid. <br />If you did not sign out your CD, please do so, and there are two vendors that we owe one to which is <br />Mitch Tourino of Magna Construction and Lourdes Vega of Williams Paving. Also, when you <br />submit your proposals, please do not bind or staple them, just put a binder clip at the top. <br />The mandatory Pre - Submittal Conference was concluded at 10:40 a.m. <br />Pre - Submittal Conference QA 113011 RIP 11 -11 -03 Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.