Laserfiche WebLink
5. How are you going to handle the closing of sidewalks? <br />The closing of sidewalks are based on FDOT standards, and so what you are going to <br />need is a Sidewalk Closed Sign on the north and south (before and after) and closest to <br />the intersection that you are not impacting so people can cross the other way. We are <br />going to be doing it by block, and so when you close off a block and you bring in the <br />dump you are going to be doing the lane closure. You do need two Lane Closure <br />Permits, one for FDOT and one for the City. You are going to be required to get an off - <br />duty police officer, and that is coordinated by you all with the City of Sunny Isles <br />Beach. <br />6. Do we pay for the permits? <br />Yes, in the body of the RFP, and everything is in there, this is all inclusive, so make sure <br />you include every cost and every price that you can imagine as part of this bid. <br />If you did not sign out your CD, please do so, and there are two vendors that we owe one to which is <br />Mitch Tourino of Magna Construction and Lourdes Vega of Williams Paving. Also, when you <br />submit your proposals, please do not bind or staple them, just put a binder clip at the top. <br />The mandatory Pre - Submittal Conference was concluded at 10:40 a.m. <br />Pre - Submittal Conference QA 113011 RIP 11 -11 -03 Page 7 of 7 <br />