drawings, they have different circles in them and he is going to make reference to just one of them. <br />The green circles depict abandoned driveways, at about 16151 Street we have driveways in Atlantic, <br />there are about four (4) driveways that are required to be abandoned which means that at those <br />locations you will be required to cut out the valley gutter, the driveway gutter, the transitions, and put <br />in a Type F because those driveways are no longer required. So when you look at the document, and <br />he passed it around, we will incorporate this, and he has created some CDs, he has to create more of <br />them, and he will give them to the Procurement Department. We cannot put them on Demand Star <br />because they were too large, and so we incorporated them into this CD. In this CD we have the <br />drawings, the permit documents, and we have the bid forms. We also have some details in it for the <br />drawings, and so we have enough information here, and he believes that we really did a good job <br />putting that power point together and so if there are any questions he will take the questions at this <br />point. <br />Director Batista opened the meeting for further questions from the prospective bidders. <br />QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS <br />1. Regarding the line items? <br />Yes, there are items for immobilization, and there are line items for MOT, and so those <br />two are segregated from all the rest. When you look at the bid form you will have the <br />site preparation on one line item with a few other elements to it, you will have removal <br />of concrete, you will have the paver installation, you will have the color patch, and you <br />will have the immobilization and the MOT. <br />As another note to that, there are specifications to be used on this project, they are <br />"FDOT Standards Specifications for Roads and Bridges Construction ", and so in the <br />documents that he put together, he put a note on there and it is in the RFP and it is <br />going to be made part of this record which is that the entire project shall meet the <br />requirements of the Florida Department of Transportation Standards Specifications for <br />Road and Bridge Construction, the latest version and so he thinks everything applies to <br />t the method of payment that <br />r include in those specifications. <br />If there are any other questions, submit those in writing. If you all believe that two <br />weeks is insufficient time to do this, now is the time to say it. Is two weeks good after <br />you get all the documents, to put together a proposal. <br />2. What is the timeframe for questions? <br />Five (5) days prior to bid opening, which is December 2, 2011 and that is why he is <br />asking the question whether or not it might be prudent to move the bid opening date. <br />Two weeks is pretty tight. <br />Okay, we will add another week to it [Wednesday, December 14, 2011 at 10:00 a.m.], <br />and so it will be three weeks from this pre -bid meeting. <br />4. Can we get the CDs now? <br />We only have five copies and there are six people. He will hand these out, and please <br />sign the log that you received the CD. He will get the additional CDs out to those who <br />do not receive it. <br />Pre- Submittal Conference QA 113011 RTP I1 -11 -03 Page 6 of 7 <br />