My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-11-03 Collins Avenue Streetscape
>
Addendum 2
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 8:11:28 PM
Creation date
1/11/2012 3:33:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Streetscape
Bid No. (xx-xx-xx)
11-11-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
as much but the other three will have to be revised, and a FDOT revision is required and a new <br />application has to be submitted and so even though we are not expired until December 2, 2011, <br />FDOT views it as a reapplication because he has made modifications to the drawings that were <br />submitted previously to FDOT. He has the drawing and so whatever modifications they require you <br />will be letting him know and he will make the changes as he drew the details. As far as the variance <br />in concerned, he signed and sealed the variance and so all we have to do is get together with the <br />successful vendor and he will sign and seal the variance, hand it to you and it is a done deal, and then <br />it goes back to FDOT. He put some notes on there just to let everyone know that they do expire <br />12/2/2011, and the new permits will be required through the contractor's qualifier. <br />Director Batista said one of the elements of this project that he wants to be clear on is the issue with <br />the corner ADA ramps. When we submitted for the permit the first time, FDOT went out and said <br />that the corners do not meet standards. Because of the City's request to deviate from their standard <br />FDOT practices, which is instead of requiring that this project modify all the ramps, they have let us <br />keep the ramps in place. In other words, we leave the ramps and only remove the sidewalk leading <br />up to the ramps, this is one of the reasons why we incorporated the color patch into this project. <br />Because at the transition point it is typical at the transition where the ramp begins that this would be <br />pavers, this flag would be pavers, this flag, this flag, and the next transition flag would be color patch <br />which allows us to keep all the ramps and their transitions in place. So this project and the linear <br />footage that you will be receiving as part of the proposal, the linear footage is up to that transition. <br />The ADA ramps, and there is another item in the body of the proposal that is for the color patch for <br />the two transition flags and the ramp flag. It is required that the Detectable Warning Surfaces <br />(DWS) be replaced. <br />Question: What about the curb and gutter? <br />Answer: The curb and gutter remain, we are not removing curb and gutters on corners, we are <br />removing curb and gutters in some locations, but we are not removing curb and gutters on <br />corner ramps, and so we are only speaking specifically on corner ADA ramps and mid -block <br />ADA ramps. At every intersection and at every street crossing you are going to run into this <br />situation. One of the reasons why we didn't want to do it at all is because some of the <br />G1G Y7111V11A- V1'LliV�G- l�ili�/,- RTCR'IVU�� s[uu-�Vau�[ucv- su�iva�wua�russ �arsvos uo u -wvva auvuc, —�V -- - -- <br />repair the roadway and do the ramps right. So FDOT has allowed us to deviate from that and <br />just paint them, and the reason for the paint is to make sure it continues with the same color <br />pattern. <br />Question: Atlantic to SR826 did not meet ADA requirements? <br />Answer: Right, that is the other concern that he had and he is hoping that, because there are <br />two ADA ramps there that are nonconforming but since it was done previously, FDOT may <br />come back and say that you are required to do that, in the event that they do that, then it <br />would have to be a change order. At this point we have only incorporated it to make sure that <br />we understand that we may have to go back and repair some of it, and again, we may not have <br />to do anything at all. <br />Director Batista said all prices for each item provided on the bid form shall be all inclusive of <br />everything. We want a 100% complete project. When you look at the bid form please incorporate <br />into that bid form everything and anything that you think is necessary to ensure that we comply with <br />the RFP for a 100% complete project. One last item, when you receive the documents for the <br />Pre - Submittal Conference QA 113011 RFP 11 -11 -03 Page 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.