My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Addendum No. 2
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-11-03 Collins Avenue Streetscape
>
Addendum 2
>
Addendum No. 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 8:11:28 PM
Creation date
1/11/2012 3:33:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Streetscape
Bid No. (xx-xx-xx)
11-11-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a linear foot price. The reason he did linear foot price was so that we can just measure the front of <br />that sidewalk and whatever that linear foot is, is what you are going to get paid so that he doesn't <br />have to consider the square footage of what goes over, etc., and so it will be a linear foot cost for the <br />frontage of the sidewalk to incorporate those, and there are a few of those. <br />Question: Are those advertising bus shelters? Does the City own them? <br />Answer: Currently they are non - advertising bus shelters, and the City owns them. Tolar is the <br />manufacturer. When you remove the screws out of that and he is not sure if you need to go to <br />Tolar for those, the lags are going to be longer than those, because you are going through the <br />brick pavers. <br />Question: Going back to Atlantic to SR826, any warranty problem? <br />Answer: No, all it is, is for passing inspections, then it is going to be change order to you all to <br />determine because at this point there is no way of knowing what they are going to say. His <br />main concern, and not the only concern, is the ramps because FDOT is very specific. At the <br />ramps they have to be in the first two (2) feet of a 7 -foot ramp, that the first two or three feet <br />have to be a certain pitch, at the driveway, and then beyond that it is a different pitch. In this <br />particular case he believes the contractor of record for the previous project installed them with <br />one complete pitch, and FDOT typically can either go with it or say you have to replace it. In <br />the event that we have to replace it, just consider that and we will make a statement now that it <br />would be a change. Let's do that separately and if it does occur then it will be a change order. <br />Question: Do you have a specific surveyor? <br />Answer: We do not have a specific surveyor for the City. <br />Question: What about the Survey Nails? <br />Answer: With the nails you are going to have to find a surveyor to go through it and then do <br />your linear foot cost throughout the project and just incorporate him into the linear foot cost. <br />Question: Can we get a copy of the power point presentation downloaded? <br />record. <br />Director Batista said at the 17200 block, it is intended that all of these aerials be completed with <br />pavers (specifically the corner of 172 and Collins Avenue). He will say on the bid form, the entry <br />gate portion is separate square footage and so that is a separate price in the bid form. This area <br />which is the corner of that at 172nd and Collins Avenue, we have a double sidewalk here, that gets <br />all incorporated. When he calculated the linear footage of that frontage, the one you are going to be <br />using to do your estimate on, what he did was, his assistant was walking on that sidewalk and then <br />she came back and measured this one as well, and so it was the linear footage of those. He excluded <br />the width because he is doing it on a linear foot basis. He is hitting the target areas of this project <br />because he wants to be clear with all the vendors. <br />Director Batista said as to the permits, the City of Sunny Isles Beach applied for four (4) perniits, one <br />of which was a variance. All four were approved however one of them is expired, and they all expire <br />on December 2, 2011. It is expected that as part of your proposal that you will be getting all four of <br />those permits and they all have to be revised. Maybe the variance is not going to have to be revised <br />Pre - submittal Conference QA 113011 R11I 11 -11 -03 Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.