My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 11-11-03 Collins Avenue Streetscape
>
Specifications
>
Specs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2012 12:43:27 AM
Creation date
1/11/2012 3:41:37 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Collins Ave. Streetscape
Bid No. (xx-xx-xx)
11-11-03
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"DIY OF sUN Pr• <br />disruptions by the Contractor to services to the community or to the commercial building will <br />need to be resolved immediately at the Contractor's cost. <br />11. The Contractor shall comply with FDOT Indexes 300, 515, 600, 612, 613, 660 as required. <br />12. All sidewalk repairs to existing (if damaged) must be performed adequately. 6" thick <br />minimum full -flag repairs. Patches and partial flag repairs /replacements will not be allowed. <br />All paver work must be flush around all drainage boxes, water meter boxes, mast arm bases, <br />sign bases, and ADA ramps to remain. Contractor shall ensure that all signage is protected <br />and that all bus shelters are removed and properly replaced. <br />13. After Installation, all concrete pavers shall be sealed with a solvent based acrylic sealer: <br />"Crystal Clear sealer" by Cobble Coat, Pompano Beach, Florida or Approved Equal. Apply two <br />thin coats (2 -3 wet MILS) as per manufacturer's specifications. <br />14. Pavers shall be in conformance with ASTM C- 936 -82. <br />15. Contractor shall ensure to maintain the integrity of existing curb and gutter to remain. <br />B. Meetings <br />The Contractor will be required to attend and /or update the City regularly. Such meetings <br />will be held at the City. Minutes of all meetings must be prepared by the Contractor and <br />submitted to all those in attendance. <br />C. Administration <br />Prior to the submission of a Proposal the Contractor is responsible for field inspections, field <br />review, utility locations, and becoming familiar with any and all site conditions that might <br />otherwise hinder the Contractor's ability to perform said services and include all necessary <br />accommodations and resolution as part of the Contractor's proposal. <br />D. Building Permit <br />The Contractor will be required to obtain, submit, and retrieve all applications for permits, final <br />permits, pay for all fees, and implement all requirements of the permits. <br />END OF SECTON <br />City of Sunny Isles Beach I Request for Proposal No. 11 -11 -03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.