Laserfiche WebLink
C <br />I T <br />Y <br />OF <br />S <br />U <br />N <br />N <br />Y <br />I <br />S <br />L <br />E <br />S <br />B <br />E <br />A <br />C <br />T <br />R A <br />F <br />F I <br />C <br />E N <br />G <br />1 <br />N E <br />E <br />R <br />I N <br />G <br />S <br />E <br />R V <br />I <br />C E <br />S <br />NW 44TH STREET — IMPROVEMENTS <br />CITY OF SUNRISE, FL <br />The scope of this project consisted of the enhancement of an existing swale conveyance system as well as <br />improvements to the existing streetscape with the addition of a sidewalk feature along the project limits. <br />Project activities included the development of a typical section analysis to determine the most feasible <br />alternative as well as the development of construction documents and permitting. A drainage analysis was <br />also performed for the design of the outfall structure that connects to a local canal. <br />CLIENT <br />City of Sunrise <br />Capital Projects <br />4747 N. Nob Hill Road, Suite # 10 & 11 <br />Sunrise, FL 33351 <br />Mr. John Cowling, PE — Project Manager <br />Tel: (954) 572- 2486/Fax: (954) 572 -2494 <br />jcowling @cityofsunrise.org <br />RJ BEHAR'S ROLE <br />Drainage and roadway improvements <br />PROJECT STARTED: 2007 <br />PROJECT COMPLETED: 2009 <br />COST/FEES PAID: $40,000 <br />CONSTRUCTION COST: $350,000 Estimated <br />RJ BEHAR'S KEY PERSONNEL <br />Javier Rodriguez, PE - Project Manager <br />Anthony V. Alfred, PE - Project Engineer <br />Claudia M. Lamus, PE - Project Engineer <br />LIMIT <br />45 <br />ElR.J.Behar R. I. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 21 <br />