|
C I T Y OF S U N N Y I S L E S B E A C H
<br />T R A F F I C E N G I N E E R I N G S E R V I C E S :i► /, h
<br />JAVIER RODRIGUEZ, PE
<br />PROJECT MANAGER
<br />EDUCATION: B. S. Civil Engineering, Florida, International University, 1987
<br />PROFESSIONAL REGISTRATIONS: P. E. Florida License No. 48264/1994
<br />TRAINING /CERTIFICATIONS: Advanced Work Zone Traffic Control Training 2007; APWA — NPDES Requirements &
<br />Understanding Stormwater Collection System 2010; Roadside Design Course, October 2002; Stream Stability and
<br />Scour at Highway Bridges
<br />YEARS OF EXPERIENCE: 24 Years YEARS WITH RJ BEHAR: 2004 —Present
<br />ENGINEERING EXPERIENCE
<br />Mr. Rodriguez has extensive experience in urban and rural roadway design, including geometry, drainage, quantity
<br />computation and construction cost estimating. His expertise includes project scheduling and administration. He has
<br />served as design engineer, drainage engineer and permit coordinator as well as project manager. At RJ Behar, Mr.
<br />Rodriguez is the Director of Civil Engineering and oversees all aspects of design and construction document preparation.
<br />He has more than 24 years of experience.
<br />RELEVANT EXPERIENCE
<br />SR- 5 /US -1 /OVERSEAS HIGHWAY FROM FONTAINE DRIVE TO S. OF TAVERNIER CREEK BRIDGE, MONROE
<br />COUNTY, FL — FDOT, DISTRICT 6
<br />Project Manager — The scope of services includes milling and resurfacing, signing and pavement markings, traffic control
<br />plans and ADA and pedestrian features upgrades. The project access management analysis resulted in the closure of
<br />several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of accidents at the
<br />corridor's one signalized intersection. Additionally the Typical Section was modified to accommodate bicycle lanes
<br />without widening.
<br />NW 7th/gth AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL
<br />Project Manager. The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector
<br />between NW 71h and NW 91h Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization,
<br />drainage design, signing pavement marking and permitting as well as public involvement coordination.
<br />NW 87th AVENUE (SR -973) TRAFFIC STUDY— FDOT, DISTRICT 6
<br />Engineer of Record — The cope included a traffic study including traffic counts to determine the optimal geometrics,
<br />traffic operations and signal warrants for 8 intersections. The scope of this project consists of final design and future new
<br />reconstruction, roadway design, traffic operations, drainage, structure and construction of NW 87th Avenue (from NW 74th
<br />Street to NW 103rd Street) within the Town of Medley.
<br />SR -7 /US -441 ROADWAY LIGHTING AND NW 111h PLACE PEDESTRIAN LIGHTING IMPROVEMENTS, CITY OF
<br />LAUDERHILL, FLORIDA — FDOT, DISTRICT 4 LAP PROJECT
<br />Project Manager — Responsible for the design, quality assurance reviews of the plans, permitting and coordination with
<br />respective agencies. The scope of this project includes milling and resurfacing, installation of decorative stamped
<br />concrete and asphalt, lighting, landscaping, and street furniture. This is a FDOT Local Agency Program (LAP) Project.
<br />Project length: 0.45 miles
<br />SR -80 (SOUTHERN BOULEVARD) — FDOT, DISTRICT 4
<br />Project Manager — Responsible for all aspects of design and plans production for the design of an urban freeway
<br />incorporating a Grade Separation Interchange with elements of a Single Point Urban Interchange (SPUI). The project
<br />included roadway design, signing and pavement markings, signalization, lighting, utility relocation, landscaping and
<br />irrigation design.
<br />SAMPLE ROAD MILLING & RESURFACING — FDOT, DISTRICT 4
<br />Project Manager — The scope was for over 2 miles of urban section resurfacing including lighting, signalization, signing
<br />and pavement marking, access management and landscaping.
<br />OLIVE AVENUE STREETSCAPE — FDOT, DISTRICT 4
<br />Project Manager /Engineer of Record — This project involved traffic calming, landscaping, signalization and drainage
<br />improvements. The project also involved the replacement of water and sewer lines.
<br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 12
<br />
|