Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S :i► /, h <br />JAVIER RODRIGUEZ, PE <br />PROJECT MANAGER <br />EDUCATION: B. S. Civil Engineering, Florida, International University, 1987 <br />PROFESSIONAL REGISTRATIONS: P. E. Florida License No. 48264/1994 <br />TRAINING /CERTIFICATIONS: Advanced Work Zone Traffic Control Training 2007; APWA — NPDES Requirements & <br />Understanding Stormwater Collection System 2010; Roadside Design Course, October 2002; Stream Stability and <br />Scour at Highway Bridges <br />YEARS OF EXPERIENCE: 24 Years YEARS WITH RJ BEHAR: 2004 —Present <br />ENGINEERING EXPERIENCE <br />Mr. Rodriguez has extensive experience in urban and rural roadway design, including geometry, drainage, quantity <br />computation and construction cost estimating. His expertise includes project scheduling and administration. He has <br />served as design engineer, drainage engineer and permit coordinator as well as project manager. At RJ Behar, Mr. <br />Rodriguez is the Director of Civil Engineering and oversees all aspects of design and construction document preparation. <br />He has more than 24 years of experience. <br />RELEVANT EXPERIENCE <br />SR- 5 /US -1 /OVERSEAS HIGHWAY FROM FONTAINE DRIVE TO S. OF TAVERNIER CREEK BRIDGE, MONROE <br />COUNTY, FL — FDOT, DISTRICT 6 <br />Project Manager — The scope of services includes milling and resurfacing, signing and pavement markings, traffic control <br />plans and ADA and pedestrian features upgrades. The project access management analysis resulted in the closure of <br />several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of accidents at the <br />corridor's one signalized intersection. Additionally the Typical Section was modified to accommodate bicycle lanes <br />without widening. <br />NW 7th/gth AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL <br />Project Manager. The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector <br />between NW 71h and NW 91h Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, <br />drainage design, signing pavement marking and permitting as well as public involvement coordination. <br />NW 87th AVENUE (SR -973) TRAFFIC STUDY— FDOT, DISTRICT 6 <br />Engineer of Record — The cope included a traffic study including traffic counts to determine the optimal geometrics, <br />traffic operations and signal warrants for 8 intersections. The scope of this project consists of final design and future new <br />reconstruction, roadway design, traffic operations, drainage, structure and construction of NW 87th Avenue (from NW 74th <br />Street to NW 103rd Street) within the Town of Medley. <br />SR -7 /US -441 ROADWAY LIGHTING AND NW 111h PLACE PEDESTRIAN LIGHTING IMPROVEMENTS, CITY OF <br />LAUDERHILL, FLORIDA — FDOT, DISTRICT 4 LAP PROJECT <br />Project Manager — Responsible for the design, quality assurance reviews of the plans, permitting and coordination with <br />respective agencies. The scope of this project includes milling and resurfacing, installation of decorative stamped <br />concrete and asphalt, lighting, landscaping, and street furniture. This is a FDOT Local Agency Program (LAP) Project. <br />Project length: 0.45 miles <br />SR -80 (SOUTHERN BOULEVARD) — FDOT, DISTRICT 4 <br />Project Manager — Responsible for all aspects of design and plans production for the design of an urban freeway <br />incorporating a Grade Separation Interchange with elements of a Single Point Urban Interchange (SPUI). The project <br />included roadway design, signing and pavement markings, signalization, lighting, utility relocation, landscaping and <br />irrigation design. <br />SAMPLE ROAD MILLING & RESURFACING — FDOT, DISTRICT 4 <br />Project Manager — The scope was for over 2 miles of urban section resurfacing including lighting, signalization, signing <br />and pavement marking, access management and landscaping. <br />OLIVE AVENUE STREETSCAPE — FDOT, DISTRICT 4 <br />Project Manager /Engineer of Record — This project involved traffic calming, landscaping, signalization and drainage <br />improvements. The project also involved the replacement of water and sewer lines. <br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 12 <br />