Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S ; <br />SUNRISE BOULEVARD AND 161h AVENUE — FDOT, DISTRICT 4 <br />Project Engineer — This was an FDOT mini - contract and he produced complete roadway plans. <br />US -1 BUS WAY PHASE II — FDOT, DISTRICT 6 <br />Engineer of Record — The scope was for the final design of an 11 mile busway corridor in South Miami -Dade County. <br />The scope included the necessary environmental document, final design, construction documents, traffic study, heavy <br />signalization design and extensive maintenance of traffic design. Estimated Construction Cost $18,000,000. <br />SUNRISE LAKES BOULEVARD IMPROVEMENTS — CITY OF SUNRISE, FL <br />Engineer of Record for the improvement of 2.3 miles of an urban collector. The improvements included the addition of <br />"Valley Gutter" on the outside edges of pavement and the reconstruction of the median. It also included milling and <br />resurfacing the entire 2.3 miles, installation of new pavement markings and signage and aesthetic treatments at three <br />intersections. <br />EPD (ENVIRONMENTAL PROTECTION DEPARTMENT) LABORATORY GREEN BUILDING — BROWARD COUNTY <br />ENGINEERING <br />Project Manager. The scope of this project included drainage design, signage, permitting and utility coordination. <br />SR -836 AUXILIARY LANES, MIAMI -DADE COUNTY, FL — MDX (EAC CONSULTING, INC.) <br />Project Manager — The scope includes widening and construction of auxiliary lanes on SR -836 at NW 571h Avenue. RJ <br />Behar is reviewing and approving final design plans. <br />NW 141h STREET /SR -836 OFF RAMP, MIAMI -DADE COUNTY, FL — MDX (EAC CONSULTING, INC.) <br />Project Manager — The scope includes the addition of an exclusive right turn lane off the SR -836 ramp and NW 14th <br />Street. RJ Behar is reviewing all the design deliverables and supervising the design firm during the design phase. <br />TOWN ENGINEER — TOWN OF SOUTHWEST RANCHES, FL <br />As Town Engineer, responsibilities include review of all building permits, fill permits, develop cost estimates for the <br />Town's capital improvement budget and represent the Town on all engineer matters. <br />SR 7 /SUNRISE BOULEVARD CONSTRUCTION INSPECTION — CITY OF LAUDERHILL, FL <br />Project Manager for the Construction Engineering Inspection Services for this intersection improvement project in the <br />City of Lauderhill. This project involved the widening and reconstruction of this major urban arterial intersection and was <br />accomplished through an agreement between the FDOT and the City. It included extensive utility coordination, resulting <br />from the widening of SR -7, drainage improvements, signalization and lighting. <br />SISTRUNK BOULEVARD (FROM FEDERAL HIGHWAY TO 27th AVENUE) — CITY OF FORT LAUDERDALE, FL <br />Project Manager for this project for the City of Fort Lauderdale C.R.A., which involved streetscape, traffic calming and <br />extensive public involvement, water line replacement. <br />NW 44th STREET IMPROVEMENTS — CITY OF SUNRISE, FL <br />Project Manager /Engineer of Record — Project activities included the development of a typical section analysis to <br />determine the most feasible alternative as well as the development of construction documents and permitting. A <br />drainage analysis was also performed for the design of the outfall structure that connects to a local canal. The scope of <br />this project consisted of the enhancement of an existing swale conveyance system as well as improvements to the <br />existing streetscape with the addition of a sidewalk feature along the project limits. Project length: 1.90 miles <br />BATTERSEA AND DOUGLAS DRAINAGE IMPROVEMENT — CITY OF MIAMI, FL <br />Drainage Engineer for the drainage improvements for a residential street intersection. This project involved producing an <br />alternative analysis, construction plans and permitting for relieving flooding at this intersection as well as permitting for <br />the improvements. <br />MIRACLE MILE MEDIAN AND SIGNAL IMPROVEMENTS — CITY OF CORAL GABLES, FL <br />Project Manager for the design and coordination of converting Miracle Mile from a 6 -lane undivided to a 4 -lane divided <br />section. The project includes exclusive left turn lanes, sidewalk improvements and replacement of all signals. <br />CITYWIDE RESURFACING INSPECTION — CITY OF CORAL SPRINGS, FL <br />Project Manager— He supervised the inspection on 15 miles of street resurfacing. <br />FLEET MAINTENANCE FACILITY — MIAMI -DADE COUNTY, FL <br />Project Manager — He was responsible for preparing the civil engineering and structural plans for the Fleet Maintenance <br />Facility. Services included contract document, permits, and utility coordination. <br />SEVEN ISLES ENTRY BEAUTIFICATION — CITY OF FORT LAUDERDALE, FL <br />Project Manager — The project consisted of improvements to the Seven Isles Entryway. These improvements included <br />adding a parking space on the west side of SE 23rd Avenue as well as beautifying two of the existing bridges. <br />1] R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 3 <br />