Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S <br />SR- 94 /KENDALL DRIVE, MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 <br />Supervised the resurfacing /widening of urban roadway, converting from a four -lane section to an eight - <br />lane urban section. The project limits were from the Turnpike to SW 132nd Avenue. <br />DESIGN /BUILD P3 FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL — FDOT, DISTRICT 4 <br />(AECOM /DRAGADOS) <br />Principal in Charge - The Interstate -595 (1 -595) corridor, between the 1- 75 /Sawgrass Expressway Interchange to just east <br />of the 1- 595/1 -95 Interchange, is proposed for improvement. The corridor improvements will consist of a minimum of three <br />general use lanes in each direction for the mainline of 1 -595, the construction of three reversible lanes in the center of the <br />corridor and upgrades to SR -84, which parallels 1 -595 on the outside. The corridor has been divided into eight <br />construction zones. RJ Behar is responsible for the design of all the corridor signals and temporary signals, and for <br />lighting plans from West of Flaming Road to East of Hiatus Road, Zones 2 and 3 (approximately 2 miles). RJ Behar is <br />also responsible for the overall drainage master plan update for the entire corridor, which includes exfiltration trenches, <br />both wet and dry stormwater management systems and complete drainage design analysis for seven out of eight design <br />zones. The Firm is also responsible for the drainage plan preparation for two roadway design sections as well as all <br />coordination between six different design firms. <br />PINES BOULEVARD (SR -820) AND 1 -75 (SR -93) INTERCHANGE CEI, CITY OF PEMBROKE PINES, FL — FDOT, <br />DISTRICT 4 <br />Principal in Charge — He was in charge of this ($11.2 million) Local Agency Program project between the City of <br />Pembroke Pines and the FDOT, District 4. This was a federally funded project consisting of urbanized improvements at <br />the 1 -75 (SR -93) and Pines Boulevard (SR -820) Interchange. The project included modifying the existing interstate <br />overpass, entrance and exit ramps from a rural configuration to an urban configuration, as well as widening, <br />signalization, landscaping and access management improvements along Pines Boulevard. "No- excuse Bonus" (250K) <br />and "Incentive /Disincentive" contracting method utilized. <br />PALM AVENUE FINAL DESIGN (FROM OKEECHOBEE ROAD TO 21s' STREET) — CITY OF HIALEAH, FL <br />Project Manager /Engineer of Record — The project included streetscape roadway plans, marking and signing plans, <br />roundabout design, and signalization plans for 6 intersections. The project consisted of converting Palm Avenue from a <br />one -way to a two -way street. <br />NW 71h /9th AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL <br />Principal in Charge — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector <br />between NW 7th and NW 911 Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, <br />drainage design, signing pavement marking and permitting as well as public involvement coordination. <br />NW 441h STREET — CITY OF LAUDERDALE LAKES, FL <br />Project Manager — The project included the design and construction management of new construction for approximately <br />0.5 mile. The scope of services included drainage plans, marking and signing plans and lighting plans. <br />ANDREWS AVENUE IMPROVEMENT — FDOT, DISTRICT 4 <br />Project Manager for the new construction of Andrews Avenue from Atlantic Boulevard to NW 151h Avenue Project <br />included roadway design, signal plans, signing and marking, lighting, bridge plans, and traffic studies <br />SOUTHERN BOULEVARD (SR -80) IMPROVEMENTS — FDOT, DISTRICT 4 <br />Project Manager /Principal in Charge — The scope was for the design and preparation of construction documents for the <br />reconstruction of a 2.5 mile urban roadway, including a major urban interchange, in West Palm Beach, Florida. <br />SR- 5 /US -1 RESURFACING (BOCA RATON, FL) — FDOT, DISTRICT 4 <br />Principal in Charge — The project involved for milling and resurfacing (RRR) of 1.4 miles of a major collector. <br />US -1 /FEDERAL HIGHWAY (FORT LAUDERDALE, FL) — FDOT, DISTRICT 4 <br />Principal in Charge of the median revisions and resurfacing of 1.5 miles, including marking and signing, were completed <br />from SR -84 to the New River Tunnel. <br />SR- 25 /OKEECHOBEE ROAD AT NW 95th STREET — FDOT, DISTRICT 6 <br />Principal in Charge for this intersection improvement project, including roadway plans, signing and marking and <br />signalization plans. <br />SR- 25 /OKEECHOBEE AT NW 116th WAY — FDOT, DISTRICT 6 <br />Principal in Charge — The scope of this project included intersection improvements and widenings. <br />US -1 (FEDERAL HIGHWAY) HALLANDALE BEACH, FL — FDOT, DISTRICT 4 <br />This project went from Ives Dairy Road to Hallandale Beach Boulevard and included design of a 1.5 mile, six -lane urban <br />divided highway. This project included design of over 20 stormwater injection wells. <br />ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 S <br />