My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F 1 C E N G I N E E R I N G S E R V 1 C E S <br />NW 87th AVENUE (SR-973/GALLOWAY ROAD) MIAMI -DADE COUNTY, FL - FDOT, DISTRICT 6 <br />Engineer of Record - He was responsible for the drainage plans and preparation of the Bridge Hydraulic Report. <br />PALM AVENUE - CITY OF HIALEAH, FL <br />Engineer of Record, for drainage design - He finalized permitting, quality control reviews, and specifications, including <br />specialty items, such as street clocks. <br />NW 44th STREET - CITY OF LAUDERDALE LAKES, FL <br />Engineer of Record for drainage and permitting. <br />MIAMI RIVER GREENWAYS, SEGMENT D - CITY OF MIAMI, FL <br />Drainage Engineer- Designed the system of French drains in conjunction with injection wells, to handle runoff. <br />BATTERSEA AND DOUGLAS ROAD DRAINAGE IMPROVEMENTS - CITY OF MIAMI, FL <br />Drainage Engineer - Designed alternatives, and drainage improvements for the City streets. <br />NEIGHBORHOOD IMPROVEMENT PROJECTS, LA GORCE, WEST AVENUE AND NAUTILUS - CITY OF MIAMI <br />BEACH, FL <br />Engineer of Record - He designed the drainage improvements for three City neighborhoods and drew up plans for the <br />construction and specifications of three stormwater pump stations with dual pumps telemetric systems, floats, and valve <br />boxes. <br />NW 5th STREET BRIDGE REPLACEMENT, MIAMI, FL- FDOT, DISTRICT 6 <br />Project Manager and Drainage Engineer for drainage and Bridge Hydraulic Reports. This project included major utility <br />coordination and large offsite discharging areas throughout the project. <br />ANSIN BOULEVARD, DRAINAGE IMPROVEMENTS - CITY OF HALLANDALE BEACH, FL <br />Project Manager - The scope involved the improvement of the drainage systems and street reconstruction in the <br />industrial area of Ansin Boulevard. <br />AREA WEST OF US 1 DRAINAGE STUDY - CITY OF HALLANDALE BEACH, FL <br />Drainage Engineer - He prepared a master drainage study to develop alternatives to resolve and mitigate flooding <br />problems. <br />NE 32nd/33rd AVENUE, NE 17th AVENUE - CITY OF FORT LAUDERDALE, FL <br />Drainage Engineer - He was responsible for the development and improvement to the drainage system and in charge of <br />reviewing reports and calculations. <br />US -1 EXCLUSIVE BUS LANES - MIAMI -DADE COUNTY, FL <br />Drainage Engineer - Performed the Bridge Hydraulic and Scour analyses for three South Florida Water Management <br />District (SFWMD) canal crossings. Supervised and implemented the drainage system design. <br />KROME AVENUE, BRIDGE HYDRAULIC REPORT (BHR) MIAMI -DADE COUNTY, FL- FDOT, DISTRICT 6 <br />Engineer of Record - Responsible for the preparation of a hydraulic report for Krome Avenue Bridge. <br />SR -874 DRAINAGE MASTER PLAN TA 874 -04 - MIAMI DADE EXPRESSWAY AUTHORITY <br />Senior Drainage Engineer - Responsible for the development of existing condition drainage maps for SR 874 Drainage <br />Master Plan. He led the stormwater model development, utilizing stormwater master planning and modeling drainage <br />software (AdICPR). <br />HOLLYWOOD BOULEVARD (SR -820) FROM SR -A1A TO US -1 (3R) - FDOT, DISTRICT 4 <br />Drainage Engineer - Drainage design for a resurfacing, restoration & rehabilitation (3R) project with widening, which <br />affected all existing drainage. A separate study was conducted, to study alternatives for the resolution of flooding <br />problems. <br />US- 11SR -5 HOLLYWOOD BOULEVARD TO SHERIDAN STREET - FDOT, DISTRICT 4 <br />Drainage Engineer - Task manager to evaluate required drainage improvements under a resurfacing, restoration and <br />rehabilitation (3R) project. <br />SW 2nd AVENUE - CITY OF FORT LAUDERDALE, FL <br />Drainage Engineer - He performed a review of the existing drainage system and proposed alternatives for <br />improvements. A report of the findings was completed and discussed with the City's staff. <br />CANAL J CULVERT - CITY OF CORAL SPRINGS, FL <br />Drainage Engineer who designed, permitted, and prepared plans for the construction of a 700 foot canal culvert. He was <br />also the project manager for the construction services of this assignment. <br />ElR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.