|
C I T Y OF S U N N Y I S L E S B E A C H
<br />T R A F F 1 C E N G 1 N E E R I N G S E R V I C E S
<br />CARLOS MAZORRA, PE
<br />SIGNING, PAVEMENT MARKING & CHANNELIZATION
<br />EDUCATION: B.S. Civil Engineering, University of Miami, December 1983
<br />PROFESSIONAL REGISTRATIONS: P.E. Florida No. 42653, 1990
<br />TRAINING /CERTIFICATIONS: Traffic Control Plan Training
<br />YEARS OF EXPERIENCE: 24 Years YEARS WITH RJ BEHAR: 2004 —Present
<br />ENGINEERING EXPERIENCE
<br />Mr. Mazorra has been the Project Engineer /Manager for the preparation of numerous, very successful highway
<br />construction plans. This included design of horizontal and vertical geometry with GEOPAK software. He has done
<br />drafting plans, profiles, cross sections, traffic controls and various ancillary roadway plan sheets using MicroStation
<br />software. Mr. Mazorra has designed roadway signal plans in collaboration with traffic engineering and structural
<br />engineering personnel. He also has 11 years of experience as an FDOT employee and knows the policies and needs of
<br />the FDOT from both a technical and managerial perspective, and can thereby assure the success of any project. At RJ
<br />Behar, Mr. Mazorra is responsible for the design, project management and quality control for the Company's Highway
<br />Group. He has 24 years of experience.
<br />RELEVANT EXPERIENCE
<br />DESIGN /BUILD P3 FOR 1 -595 FINAL DESIGN — BROWARD COUNTY, FL — FDOT DISTRICT 4
<br />(AECOM /DRAGADOS)
<br />Task Manager — He is in charge of the design and production of the signalization design of 12 intersections along SR -84
<br />for the reconstruction of the 1 -595 corridor.
<br />POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Engineer for the signal design. The project included milling and resurfacing 3 miles of a major collector, 8 signal
<br />upgrades, safety improvements and miscellaneous drainage improvements.
<br />NW 87th AVENUE (SR- 973 /GALLOWAY ROAD) MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6
<br />Project Engineer in charge of the signalization plans for the new construction and reconstruction of NW 871h Avenue from
<br />NW 74th Street to NW 103rd Street in Medley, Florida. The scope of this project included roadway plans, drainage, traffic,
<br />lighting, signing and marking, signalization and bridge plans.
<br />SR -806 (ATLANTIC AVENUE) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Manager — Responsible for this milling and resurfacing (RRR) project of 3 miles of a major arterial, signal
<br />improvements, safety improvements and miscellaneous drainage improvements.
<br />SR -838 (SUNRISE BOULEVARD) NW 27th AVENUE, BROWARD COUNTY, FL — FDOT, DISTRICT 4
<br />Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization
<br />plans. The scope of this safety improvement project is to mill and resurface NW 27th Avenue, as well as improve the
<br />existing signalization system.
<br />SR -838 (SUNRISE BOULEVARD) NW 31St AVENUE BROWARD COUNTY, FL — FDOT, DISTRICT 4
<br />Project Manager in charge of the design and production of roadway, signing and pavement marking, and signalization
<br />plans. The scope of this safety improvement project is the addition of two left turn lanes, milling and resurfacing, and
<br />pavement widening and the addition of two new signal mast arms.
<br />NW 44th STREET — CITY OF LAUDERDALE LAKES, FL
<br />Project Manager — Construction of a new 4 -lane median divided facility. The project includes roadway plans, drainage
<br />plans, privacy walls plans, and permitting, utility coordination and inspection services.
<br />ATLANTIC BOULEVARD /ROCK ISLAND ROAD INTERSECTION IMPROVEMENT — BROWARD COUNTY
<br />ENGINEERING
<br />Project Manager — He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and
<br />utility coordination for a major intersection improvement.
<br />HILLSBORO BOULEVARD /MILITARY TRAIL INTERSECTION IMPROVEMENT — BROWARD COUNTY
<br />ENGINEERING
<br />Project Manager — He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and
<br />utility coordination for this major intersection improvement.
<br />® R.).Behar R. I. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 8
<br />
|