My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2012 5:25:31 AM
Creation date
1/11/2012 4:19:46 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering Services
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G 1 N E E R I N G S E R V I C E S <br />HOLLYWOOD BOULEVARD /N. 281h AVENUE INTERSECTION IMPROVEMENT — BROWARD <br />COUNTY ENGINEERING <br />Project Manager — He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans and <br />utility coordination for this major intersection improvement. <br />SR -820 (PINES /HOLLYWOOD BOULEVARD) FROM EAST OF 64th WAY TO WEST OF SR -7, BROWARD <br />COUNTY, FL — FDOT, DISTRICT 4 <br />Project Manager — Responsible for this milling and resurfacing (RRR) of the existing pavement; upgrading roadway signs <br />and curb ramps to meet current standards, upgrade pedestrian and signal features and Landscape improvements. <br />SR- 836/SR -826 (SECTION 5) PLANS REVIEW — MDX (EAC CONSULTING, INC.) <br />Project Engineer— Reviewed roadway plans and provided comments. <br />SR- 5 /US -1 RESURFACING (BOCA RATON, FL) — FDOT, DISTRICT 4 <br />Project Manager — He was responsible for the milling and resurfacing (RRR) project of 1.4 miles of a major collector. <br />Upgraded pavement markings were included. <br />SR -5 (US -1 /SOUTH FEDERAL HIGHWAY) DEERFIELD BEACH, FL — FDOT, DISTRICT 4 <br />Project Manager — He was responsible for the milling and resurfacing (RRR) of a major arterial; including safety <br />improvements. <br />SR -5 (BISCAYNE BOULEVARD) DOWNTOWN MIAMI — FDOT, DISTRICT 6 <br />Project Engineer in charge of signal and streetlight design in Downtown Miami. <br />SR -909 (WEST DIXIE HIGHWAY) — FDOT, DISTRICT 6 <br />Project Engineer in charge of signal and streetlight design. <br />SR -922 (96th STREET) — FDOT, DISTRICT 6 <br />Project Engineer in charge of signal design. <br />SR -934 (NW 81St /NE 82nd STREET) — FDOT, DISTRICT 6 <br />Project Manager for resurfacing and replacement of traffic signals and street lights. <br />SR- 985 /FLAGLER STREET INTERSECTION — FDOT, DISTRICT 6 <br />Project Engineer in charge of signal design. <br />HEFT MEDIAN SAFETY IMPROVEMENTS — FDOT TURNPIKE ENTERPRISE <br />Senior Highway Engineer in charge of the design of the construction, resurfacing and safety improvements. <br />SR -5 (US -1) ST. LUCIE COUNTY, FL — FDOT, DISTRICT 4 <br />Project Manager/ Engineer - RRR project in St. Lucie County, FL <br />SR -802 LAKE WORTH ROAD /MILITARY TRAIL INTERSECTION — FDOT, DISTRICT 4 <br />Project Engineer for RRR intersection improvements. <br />SR -824 PEMBROKE ROAD /72nd AVENUE INTERSECTION — FDOT, DISTRICT 4 <br />Project Engineer for RRR intersection improvement. <br />RAILROAD HAZARD BEACON — FDOT, DISTRICT 4 <br />Project Engineer— Installed hazard beacons at various locations districtwide. <br />SR -834 SAMPLE ROAD /NE 3rd AVENUE INTERSECTION — FDOT, DISTRICT 4 <br />Project Engineer for RRR intersection improvement. <br />SR- 862/1 -595 IMPROVEMENTS — FDOT, DISTRICT 4 <br />Project Engineer - Realignment of expressway entrance ramps. <br />SR -94 (KENDALL DRIVE) — FDOT, DISTRICT 6 <br />Project Engineer in charge of resurfacing and reconstruction. <br />COUNTYWIDE - MIAMI -DADE COUNTY, FL — FDOT, DISTRICT 6 <br />Project Engineer for traffic signal railroad preemptions. <br />SR -823 (NW 57th AVENUE) — FDOT, DISTRICT 6 <br />Project Engineer for complete reconstruction of 4 -lane facility to 6 -lane divided. <br />SR -5 (US -1) MATECUMBE KEY — FDOT, DISTRICT 6 <br />Project Engineer for resurfacing project on upper Matecumbe Key, Florida. <br />SR -976 (BIRD ROAD) — FDOT, DISTRICT 6 <br />Project Engineer for resurfacing and reconstruction. <br />EJR.).Behar R. I. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.