Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G I N E E R I N G S E R V I C E S <br />ANTHONY V. ALFRED, PE <br />HIGHWAY DESIGN <br />EDUCATION: B.S. Civil Engineer, Florida International University, 1991 <br />PROFESSIONAL REGISTRATIONS: P. E. Florida No. 51857/1997 <br />TRAINING /CERTIFICATIONS: Advanced Work Zone Traffic Control Training 2007; APWA — NPDES Requirements & <br />Understanding Stormwater Collection System 2010; Roadside Design Course, October 2002; Stream Stability and <br />Scour at Highway Bridges <br />YEARS OF EXPERIENCE: 19 Years YEARS WITH RJ BEHAR: 2006 —Present <br />ENGINEERING EXPERIENCE <br />Mr. Alfred has extensive experience in transportation design engineering. He is well- versed with the FDOT design and <br />plans preparation process. He has participated in public involvement, and has been the Utility Coordinator for many <br />FDOT projects. He proficiently uses and trains staff on the use MicroStation (V8) /GEOPAK, running the FDOT <br />SiteMenu. He has experience in the preparation of lighting analysis using the AG132 software. He has used electronic <br />delivery (PEDDS) to submit projects to FDOT, District 4. <br />Mr. Alfred has 19 years of experience and brings a wealth of knowledge in transportation engineering and design. Mr. <br />Alfred is also MOT certified for FDOT projects. <br />RELEVANT EXPERIENCE <br />BUENA VISTA HEIGHTS — CITY OF MIAMI, FL <br />Project Manager — The scope included design and production of roadway plans, drainage, milling and resurfacing, <br />overbuild and widening, new curb, signing and pavement marking plans and permit package. <br />MIAMI RIVER GREENWAYS, SEGMENT D — CITY OF MIAMI, FL <br />Project Manager — The project consists of the reconstruction of an existing roadway segment along the Miami River to <br />produce a scenic, landscaped, pedestrian /bicycle walkway /greenway. The project includes the design of a drainage <br />system with wells, decorative lighting and landscape /hardscape design. <br />NORTH BAYSHORE DRIVE OPERATIONAL IMPROVEMENTS — CITY OF MIAMI, FL <br />Project Engineer — Project consists of roundabout/construction along with milling and resurfacing at the intersection of <br />North Bayshore Drive and NE 171h Terrace, which includes roadway plans, signing & marking plans and landscaping <br />plans. As part of the improvements for this area, we are introducing the design of a roundabout (traffic circle) on the <br />corner of North Bayshore Drive and NE 171h Terrace. <br />DOWNTOWN MIAMI STORM SEWER PROJECT (NORTH BAYSHORE DRIVE) — CITY OF MIAMI, FL <br />Quality Control Engineer — The project consisted of a total reconstruction of the roadway, and the design and <br />implementation of a drainage system which included the replacement of the subsurface drainage system. Also as a part <br />of the stormwater management system drainage wells were utilized to assist in alleviating flooding. The project required <br />drainage calculations for approval from DERM. <br />NW 87th AVENUE (SR- 973 /GALLOWAY ROAD), MIAMI -DADE COUNTY, FL— FDOT, DISTRICT 6 <br />Project Manager responsible for roadway design of new construction and reconstruction of NW 871h Avenue from NW <br />74th Street to NW 103rd Street in Medley, Florida. The scope of this project included roadway plans, drainage, traffic, <br />lighting, signing and marking, signalization and bridge plans. <br />WEST 72nd STREET — CITY OF HIALEAH, FL <br />Engineer of Record /Utility Coordinator — He designed and engineered all of the construction documents for the <br />reconstruction of the roadway and drainage systems. He also performed all of the utility coordination. <br />SW 3281h STREET FROM SW 152nd AVENUE TO SW 137th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS <br />Senior Project Engineer — The scope of the project included master planning and feasibility analysis for the new <br />roadway. This project involved the upgrading of the existing traffic signals to mast -arms and internally illuminated signs. <br />The design phase for this project included drainage, lighting, signalization, signing and pavement markings, <br />® R.j.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 10 <br />