Laserfiche WebLink
C I T Y OF S U N N Y I S L E S B E A C H <br />T R A F F I C E N G 1 N E E R I N G S E R V I C E S <br />DIMA POE, MS, El <br />TRAFFIC ENGINEERING <br />EDUCATION: M.S. in Transportation Engineering, University of Florida, Gainesville, Florida, 2006; B.S. in Civil <br />Engineering, Florida International University, Miami, Florida 2004 <br />PROFESSIONAL REGISTRATIONS: E.I. Florida License No. 1100009445, 2004 <br />TRAINING /CERTIFICATIONS: 52 Graduate Credits in Urban and Regional Planning, University of Florida, Gainesville, <br />Florida; Software knowledge ArcGIS (ESRI), Cube Voyager, CORSIM, Transyt -7F, Passer II -02, Synchro 4, AutoCAD, <br />SPSS, Microsoft Office Suite (Word, Excel, Power Point, Publisher, etc.), Open Office Suite; Engineers in Training Exam <br />(EIT) or FE; Interdisciplinary Concentration in Geographic Information Systems (ICGIS) Certification course work <br />YEARS OF EXPERIENCE: 4 Years YEARS WITH RJ BEHAR: 2011 —Present <br />ENGINEERING EXPERIENCE <br />Ms. Poe is currently an Engineer Intern. She has one year of transportation and traffic engineering experience. At RJ <br />Behar, Ms. Poe is responsible for traffic and transportation engineering, parking safety studies, land use and <br />transportation planning. <br />RELEVANT EXPERIENCE <br />SR- 874 /DON SHULA EXPRESSWAY RAMP CONNECTOR - PROJECT DEVELOPMENT AND ENVIRONMENT <br />STUDY — METRIC ENGINEERING, INC. /RJ BEHAR <br />Project Engineer — She is assisting with the required traffic engineering analysis and the development of major <br />documents, such as the Interchange Modification Report and the Design Traffic Technical Memorandum. <br />MIAMI DADE COLLEGE — MIAMI, FL <br />Adjunct Faculty Teacher - Intro to Engineering courses — This course requires knowledge of basic engineering principles <br />such as statics, dynamics, ethics, and engineering economics. She is solely responsible for the curriculum taught and for <br />administration of exams, quizzes, and other assignments. <br />COMMUNITY REDEVELOPMENT AREA (CRA) PLAN — CITY OF HAWTHORNE, FL <br />Project Engineer — This was a project to update the Community Redevelopment Area (CRA) Plan for the City of <br />Hawthorne, Florida. She conducted several site visits to collect data by observation as well as from interviews with the <br />commissioners, city employees, and other stakeholders in the community. She was responsible for the Facilities and <br />Service element of the plan; which included assessing and making recommendations on roads, streetscape, parks and <br />open spaces, water and sewer services, and emergency services. Two presentations were made to the City Council and <br />attending townspeople on the findings and recommendations. <br />TRANSPORTATION ELEMENT OF COMPREHENSIVE PLAN UPDATE AND EAR AMENDMENTS — CITY OF <br />ZEPHYRHILLS, FL <br />Traffic Technician — She worked with the Center for Building Better Communities to help small cities with comprehensive <br />plan amendments and updates. She completed a data and analysis report for the transportation element of their <br />comprehensive plan and created all of the supporting materials (such as maps, posters, and brochures) for a <br />transportation charrette held at City Hall in Zephyrhills. She presented the City of Zephyrhills with a traffic circulation <br />element planning framework consisting of the specific goals and objectives that would go into their Evaluation and <br />Appraisal Report. She wrote a summary of events as a case study for a Best Practices in Small City Transportation <br />Guide. <br />RE- DESIGNING ORANGE BOWL STADIUM — MIAMI, FL <br />Student — This design project was to redesign the Orange Bowl in Miami Florida to accommodate both football and <br />baseball venues. She was responsible for the transportation and parking elements of the project. The two main issues to <br />address for this stadium were the traffic congestion caused on game days and the lack of parking causing attendees to <br />park in the nearby residential housing. To alleviate the traffic congestion, Ms. Poe proposed to increase public <br />transportation to the area and integrated an underground metro rail stop at the stadium. To help the parking problem for <br />the stadium, she created four parking garages to be situated around the stadium; these structures would also be the <br />foundation for a retractable roof. The final project was presented to the Mayor of the City of Miami. <br />® R.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ No. 11 -11 -01 1 28 <br />