|
C I T Y OF S U N N Y I S L E S B E A C H
<br />T R A F F I C E N G I N E E R I N G S E R V I C E S
<br />MARLIN SCATTOLINI
<br />HIGHWAY DESIGN
<br />EDUCATION: B.S. Civil Engineering Florida International University, Miami, Florida, 2006
<br />PROFESSIONAL REGISTRATIONS: Not Applicable
<br />TRAINING /CERTIFICATIONS: FDOT Specifications Package Preparation Training for Consultants
<br />YEARS OF EXPERIENCE: 5 Years YEARS WITH RJ BEHAR: 2006 —Present
<br />ENGINEERING EXPERIENCE
<br />At RJ Behar, Ms. Scattolini is in charge of design and plans preparation of roadway projects, drainage plans, signing and
<br />pavement marking plans, signalization plans, as well as permitting package. She has more than five years of
<br />experience.
<br />RELEVANT EXPERIENCE
<br />MIAMI RIVER GREENWAYS, SEGMENT D — CITY OF MIAMI, FL
<br />Designer — The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a
<br />scenic, landscaped, pedestrian /bicycle walkway /greenway. The project includes the design of a drainage system with
<br />wells, decorative lighting and landscape /hardscape design.
<br />SW 328th STREET FROM SW 152nd AVENUE TO SW 137th AVENUE — MIAMI -DADE COUNTY PUBLIC WORKS
<br />Designer responsible for the preparation of roadway, signing & pavement marking plans and drainage plans. The scope
<br />of the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading
<br />of the existing traffic signals to mast -arms and internally illuminated signs. The design phase for this project comprised of
<br />drainage, lighting, signalization, signing and pavement markings.
<br />SR -836 EMERGENCY ACCESS RAMP, MIAMI -DADE COUNTY, FL — MDX
<br />Project Designer responsible for the roadway plans, traffic control plans, drainage analysis, utility coordination, lighting
<br />plans, signing and marking plans, structures (retaining walls) and special access gates.
<br />W. 2911 STREET 3R SAFETY REVIEW (FROM OKEECHOBEE ROAD TO W. 4th AVENUE) — CITY OF HIALEAH, FL
<br />Project Designer for the design and production of roadway, drainage, signing and pavement marking plans. The scope of
<br />services consisted of a 3R Safety Review, which included crash data analysis and field observations to provide a report
<br />with recommendations to minimize the frequency of accidents.
<br />PALM AVENUE (FROM WEST 45th STREET TO WEST 49th STREET) CITY OF HIALEAH, FL
<br />Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans.
<br />The scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement
<br />markings and lighting plans on Palm Avenue from West 45th Street to West 47th Street and from West 47th Street to
<br />West 49th Street in the City of Hialeah.
<br />POWERLINE ROAD (SR -845) PALM BEACH COUNTY, FL — FDOT, DISTRICT 4
<br />Project Designer — Responsible for the preparation of roadway, signing and pavement marking plans, 3R reports, plans
<br />preparation, utility coordination, pavement design and quantities. Project length: 3 miles.
<br />E. 1St AVENUE, E. 47th STREET, E. 48th STREET - RECONSTRUCTION — CITY OF HIALEAH, FL
<br />Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans.
<br />SR -5 (US -1 /SOUTH FEDERAL HIGHWAY) BROWARD /PALM BEACH COUNTIES, FL— FDOT, DISTRICT 4
<br />Project Designer— She prepared the signing plans.
<br />SR -806 (ATLANTIC AVENUE) PALM BEACH COUNTY, FLORIDA— FDOT, DISTRICT 4
<br />Project Designer — Responsible for the preparation of the signing plans. The scope included milling and resurfacing
<br />(RRR) of 2.8 miles of a major arterial roadway, including drainage improvements, pavement marking and signing, lighting
<br />plans, eight signal locations, a public involvement program and landscape improvements.
<br />NW 71h /9th AVENUE CONNECTOR (DESIGN) — CITY OF FORT LAUDERDALE, FL
<br />Project Designer — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector
<br />between NW 7th and NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization,
<br />drainage design, signing pavement marking and permitting as well as public involvement coordination.
<br />EJR.J.Behar R. J. BEHAR & COMPANY, INC. I RFQ NO. 11 -11 -01 1 37
<br />
|