My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FTE
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
FTE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2012 9:37:34 AM
Creation date
1/11/2012 4:32:58 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br />REQUEST FOR QUALIFICATIONS - RFQ 11 -11 -01 <br />-FTE, TRAFFIC ENGINEERING SERVICES <br />IV. METHODOLOGY <br />SAFETY <br />South Florida traffic conditions require that the assigned staff is intimately familiar with roadway conditions and <br />characteristics, and able to assess and mitigate situations of risk by providing prudent response. FTE <br />understands that the safety of the staff and the general public is a main concern, and our safety procedures <br />have proven to be very effective. In addition, all staff assigned to this contract will abide by FTE's general safety <br />rules. All field trucks and vans are equipped with safety advisory features, and at all times, field crews will <br />consist of two team members either during the installation of equipment or daily inspections. <br />CURRENT AND PLANNED WORKLOADS <br />We are fully capable of maintaining its full commitment to this project, while meeting the needs of other clients. <br />Our staff's availability is high at this time. FTE has qualified professionals and technical staff available for the <br />required services. Based on the existing and anticipated workload, FTE will have no conflict in committing staff <br />to this project. Our staff availability will permit immediate mobilization on this project, and FTE will dedicate a <br />high priority to this project throughout its duration. In addition, FTE is committed to dedicating the proposed <br />staff for the necessary time on any assigned task by the City and by our Project Manager. Moreover, FTE has no <br />current workload with the City of Sunny Isles Beach. <br />Traffic Engineering Services — RFQ #11 -11 -01 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.