My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consulting Eng. & Science, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
CES Consulting Eng. & Science, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:56:08 AM
Creation date
1/11/2012 4:36:48 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y; 1 <br />1; i <br />Consulting Engineering & Science Inc <br />The following pages provide examples: <br />Publix Supermarket <br />106 Ponce de Leon, Coral Gables <br />Client Name: Global Fund Investments LLC <br />Doron Valero, President <br />Address: 1601 Washington Avenue Suite 310 Miami Beach Florida 33139 <br />Client Phone: (305 ) 535 -6305 <br />Description of scope of the work: <br />E -mail: jdvalero@gfinvestments.net <br />Publix Supermarket at Flagler/Douglas/Ponce <br />Coral Gables, Florida <br />The project included a new urban (ground level store with structured parking above) <br />Publix Supermarket situated on a 2.5 -acre parcel of land located in the "triangle" <br />created by the intersections of West Flagler Street (State Road 968), S.W. 37th <br />Avenue and Ponce de Leon Boulevard. The site is within the corporate limits of both <br />the City of Miami and the City of Coral Gables. The project included driveway <br />connections to adjacent roadways; on -site paving, grading and drainage <br />improvements; and, off -site water main and sewer main extensions necessary to serve <br />the project. <br />Month and Year the project was started and completed: Design Completion: 2009• <br />Construction Completion: 2011. <br />Role of Firm and Responsibilities: <br />Under contract to the Developer, and working closely with the Project Architect and <br />ultimate user, Consulting Engineering & Science, Inc. served as Civil Engineer of <br />Record for the design, preparation of construction documents and permitting of this <br />project. Special features included coordinating permitting of all improvements with <br />both the City of Miami Building Department and the City of Coral Gables Building <br />Department; securing special and drainage permits from the Florida Department of <br />Transportation; coordinating right -of -way dedications to the County along S.W. 37th <br />Avenue; securing release of portions of the project site from WASD's sewer service <br />area; and, overall dealing with three (3) local regulatory authorities (Miami -Dade <br />County, City of Miami and City of Coral Gables). During construction, a video study <br />of existing adjacent sewer mains indicated pipe damage; and, we coordinated with the <br />Owner, Contractor and City to have this damage repaired during the project's <br />construction. <br />City RFP No. 11 -11 -01 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.