Laserfiche WebLink
- LCalvin, Giordano &Associates, Inc. <br />tkN E X C E P T 1 0 N A L 5 0 L U I 1 0 N S <br />SR AlA (COLLINS AVENUE) AT <br />NE 175TH MEDIAN CLOSURE STUDY <br />Sunny Isles Beach, Florida <br />jjj! <br />N 01211-111. 1 <br />eF <br />wi <br />H I! 11 <br />4 nBi <br />d <br />----------------------- <br />of <br />nL <br />---------- :'-'17:1 <br />The City of Sunny Isles Beach requested a traffic engineering study be completed to <br />support the closing of the NW 17S,h Terrace median opening along SR AlA (Collins <br />Avenue). The study limits of the project included SR AlA (Collins Avenue) from NW 174 <br />Street to NW 178 Street. <br />The scope of services included, AM and PM field observation, condition diagram, data <br />collection, crash analysis, collision diagrams, existing condition operational analysis, <br />future condition operational analysis and recommendations. <br />In addition, CGA has secured FDOT LAP Funding for the project and is coordination the <br />project on behalf of the City. <br />Client <br />City of Sunny Isles Beach <br />Contact information <br />at time of project: <br />Jeff Maxim <br />Assistant to City Manager <br />18070 Collins Avenue <br />Sunny Isles Beach <br />Florida 33160 <br />(305) 792-1701 <br />Project Date <br />2005-Present <br />Services Provided <br />Traffic Engineering <br />Principal in Charge <br />Shelley Eichner, AICP <br />Team Members <br />Jeffery Maxwell, PE, PTOE <br />James Spinks, PE, PTOE <br />Bryan Kelley, El <br />Consultant Cost <br />Varies <br />TE0007 NW 175 TerrNedianClosure-SIB I Page 212 <br />RM <br />rM <br />El <br />HE <br />on <br />E <br />5— <br />MIN <br />H, <br />4 nBi <br />d <br />----------------------- <br />of <br />nL <br />---------- :'-'17:1 <br />The City of Sunny Isles Beach requested a traffic engineering study be completed to <br />support the closing of the NW 17S,h Terrace median opening along SR AlA (Collins <br />Avenue). The study limits of the project included SR AlA (Collins Avenue) from NW 174 <br />Street to NW 178 Street. <br />The scope of services included, AM and PM field observation, condition diagram, data <br />collection, crash analysis, collision diagrams, existing condition operational analysis, <br />future condition operational analysis and recommendations. <br />In addition, CGA has secured FDOT LAP Funding for the project and is coordination the <br />project on behalf of the City. <br />Client <br />City of Sunny Isles Beach <br />Contact information <br />at time of project: <br />Jeff Maxim <br />Assistant to City Manager <br />18070 Collins Avenue <br />Sunny Isles Beach <br />Florida 33160 <br />(305) 792-1701 <br />Project Date <br />2005-Present <br />Services Provided <br />Traffic Engineering <br />Principal in Charge <br />Shelley Eichner, AICP <br />Team Members <br />Jeffery Maxwell, PE, PTOE <br />James Spinks, PE, PTOE <br />Bryan Kelley, El <br />Consultant Cost <br />Varies <br />TE0007 NW 175 TerrNedianClosure-SIB I Page 212 <br />