|
L _ l g Calvin, Giordano & Associates, Inc.
<br />)I E X C E P T I O N A L S O L LI T 1 O N 5
<br />5
<br />e
<br />JAMES E. SPINKS III, PE, PTOE
<br />Traffic Engineer
<br />SUMMARY OF QUALIFICATIONS
<br />Mr. Spinks currently serves as a Project Manager with extensive experience in the traffic
<br />engineering and transportation planning fields. Mr. Spinks has been involved in traffic
<br />EDUCATION
<br />operations, transportation planning, and ITS planning for more than seven (7) years. He
<br />B.S. in Civil Engineering,
<br />has previous experience servicing a variety of clients such as the Florida Marlins, City of
<br />University of Missouri,
<br />Miami, Broward County, Miami -Dade County, Florida's Turnpike Enterprise, and Florida
<br />Rolla, December 1998
<br />Department of Transportation, Districts Four and Six. Currently, Mr. Spinks provides a
<br />variety of traffic engineering services for several cities within the South Florida area
<br />PROFESSIONAL
<br />such as Weston, West Park, Sunny Isles Beach, Homestead, and the Town of Surfside
<br />REGISTRATION
<br />which include traffic calming, site plan review, traffic impact study reviews, access
<br />Professional Engineer,
<br />management, and level of service analysis. In addition, he provides traffic impact
<br />State of Florida,
<br />services for several developments within South Florida. Mr. Spinks has the capability to
<br />PE No. 66775, 2007
<br />develop scope and budget, and man -hour management. He is proficient in the use of
<br />Professional Engineer,
<br />several commonly -used traffic engineering software such as HCS, Synchro, Sim - Traffic,
<br />Puerto Rico, 2006
<br />Corsim, Signa12000, as well as being familiar with Vissum, MicroStation, ArcView,
<br />ArcMap and GIS.
<br />PROFESSIONAL
<br />ASSOCIATIONS
<br />PROJECT EXPERIENCE
<br />Member of ITE
<br />Arts Park Village at Young's Circle, Hollywood, Florida (2008). Project Manager for
<br />mixed -use development located in downtown Hollywood, Mr. Spinks' tasks included
<br />Member of National Society
<br />traffic impact studies, parking inventory studies, shared parking analysis, level of service
<br />of Black Engineers
<br />analysis, arterial and intersection analyses, and development of recommendations for
<br />Member of American
<br />approval of the proposed development.
<br />Society of Civil Engineers
<br />Sheridan Station Transit Oriented Development (TOD), Hollywood, Florida
<br />(2007). Project Manager for mixed -use transit oriented development located in
<br />Hollywood, near the Sheridan Station Tri -Rail Station. Various traffic engineering and
<br />planning tasks were performed for the proposed TOD including traffic impact studies,
<br />arterial and intersection level of service analyses, and development of recommendations
<br />for approval of the proposed TOD.
<br />174 Street Median Closure Study, Sunny Isles Beach, Florida (2008). Mr. Spinks
<br />served as the project manager for this arterial study along SR -A1A near NW 174 Street
<br />in Sunny Isles, Florida, within Miami -Dade County. This study included analysis of nearly
<br />a half -mile segment of SR A1A, which included crash analysis, existing condition and
<br />future level of service analysis, access management review, benefit -cost analysis and
<br />recommendations.
<br />Fort Lauderdale - Hollywood International Airport, Automated People Mover
<br />DEIS /FEIS, General Consultant, Broward County, Florida. Mr. Spinks served as a
<br />transportation engineer on this contract, performing a series of tasks for the proposed
<br />connection between the Fort Lauderdale - Hollywood International Airport and Port
<br />Everglades including: Travel Demand Data Collection and Analysis which includes
<br />development of a calibrated operational model that would properly reflect existing
<br />unique travel characteristics in the area; Planned Regional Impact Project Analysis
<br />which will determine the level of impact and identify any mitigation needed when these
<br />projects are in place; and Travel Demand Forecast using the Southeast Regional
<br />Planning Model 6.0 (SERPM6) which will refine the current Broward County MPO
<br />Page 315
<br />
|