|
Calvin, Giordano & Associates, Inc.
<br />E% C E P T 1 0 N A L 5 0 L ll T 1 0 N 5
<br />■
<br />RAYMOND J. PIPPITT, PE
<br />Director of Roadway /Highway Design
<br />SUMMARY OF QUALIFICATIONS
<br />J
<br />Mr. Pippitt has 35 years of experience in project management and is CGA's Director of
<br />Highway Design. His primary area of expertise is highway design, work zone traffic,
<br />EDUCATION
<br />quality control and project management. Mr. Pippitt's experience in managing
<br />B.S. Civil Engineering,
<br />?
<br />transportation projects has included more than 100 projects. His extensive experience
<br />Newark College of
<br />includes bridge replacement, bridge rehabilitation, new roadway construction, widening
<br />Engineering (NJIT),
<br />and reconstruction, milling and resurfacing and several traffic capacity and safety
<br />Newark, New Jersey
<br />improvement projects. Mr. Pippitt served in the capacity of Deputy District Design
<br />PROFESSIONAL
<br />Engineer in the Florida Department of Transportation's District 4 office for 10 years. His
<br />REGISTRATION
<br />responsibilities included managing the District's Quality Control section, acting as the
<br />District Pavement Design Engineer, District Estimates Engineer and District Specifications
<br />Registered Professional
<br />Engineer. He also served an additional 9 years as a project manager with FDOT.
<br />Engineer, State of Florida,
<br />j
<br />No. 33878
<br />PROJECT EXPERIENCE
<br />State of New Jersey
<br />1 -75 at Pines Boulevard (SR -820) LAP project FDOT /City of Pembroke Pines,
<br />No. GE028506
<br />Florida. Acting as Engineer of Record Mr. Pippitt was in responsible charge of all design
<br />p
<br />elements of the roadway design. Specifically related to Design Groups 3.3, 7.1 and 7.3,
<br />Registered Professional
<br />Planner, State of New
<br />for the urbanization of this interstate interchange. City of Pembroke Pines City
<br />Jersey No. L1002752
<br />Engineer: Joe McLaughlin, P.E. (954) 435 -6511 and FDOT Project Manager: Leslie
<br />?
<br />Wetherell, P.E. (954) 777 -4438.
<br />PROFESSIONAL
<br />AFFILIATIONS
<br />I -75 /Alligator Alley FDOT, Broward County, Florida. Acting as Engineer of Record
<br />Mr. Pippitt was in responsible charge of all design elements of the roadway design.
<br />FICE Transportation
<br />Specifically related to Design Groups 3.3 and 7.1, for the Interstate RRR project to
<br />Committee
<br />resurface and widen the inside shoulders for 12 miles of interstate. FDOT Project
<br />Florida Engineering Society
<br />Managers: Christine Bacomo, P.E. (954) 777 -4147 and Ronald Wallace, P.E. (954) 777-
<br />National Society of
<br />i
<br />4641.
<br />Professional Engineers
<br />Lake Shore Drive from Lake Park Marina to US -1. Acting as Engineer of Record Mr.
<br />Institute of Transportation
<br />Pippitt was in responsible charge of all design elements of the roadway and drainage
<br />Engineers
<br />design. The project's objective was to correct a historic flooding problem in the area.
<br />American Society of
<br />The Town Manager for the Town of Lake Park Maria Davis (561) 881 -3304.
<br />Highway Engineers
<br />I -95 Design /Build from the Broward /Palm Beach County Line to south of Linton
<br />CERTIFICATIONS
<br />Blvd., FDOT, Palm Beach County, Florida. Design for the resurfacing of I -95, guardrail
<br />FDOT - Advanced Work
<br />replacement and upgrade to current standards, bridge deck repairs, addition of shoulder
<br />Zone Traffic Control
<br />barrier Noise Wall, drainage, ramp improvements, and signing and pavement markings.
<br />FDOT Project Manager: Henry Oaikhena, PE, (954) 777 -4445.
<br />FDEP - Stormwater, Erosion
<br />and Sedimentation Control
<br />SR- 7 /US441FDOT, Broward County, Florida. Acting as Engineer of Record for the
<br />Inspector
<br />median modification, addition of turn lanes and signing and pavement markings for this
<br />safety project. FDOT Project Manager: Ronald Wallace, P.E. (954) 777 -4641.
<br />SR- 820 /Pines Boulevard, Pembroke Pines, Florida. These improvements along SR-
<br />820 were designed in a cooperative effort between the FDOT and the City of Pembroke
<br />Pines to facilitate needed roadway improvements in the City. These projects included
<br />milling and resurfacing, pavement reconstruction, widening, drainage, permitting,
<br />sidewalk, utility construction and relocation. City of Pembroke Pines Project Manager:
<br />Paul Edelstein (954) 437 -1115.
<br />Page 3113
<br />
|