Laserfiche WebLink
l� <br />i <br />L-0; <br />c <br />Calvin, Giordano & Associates, Inc. <br />E X C E P T 1 0 N A L 5 0 L U T 1 0 N S <br />Raymond Pippitt, PE, Page 2 <br />Pembroke Roadway Corridor Improvements, Pembroke Pines, Florida. These improvements to seven <br />project segments in southwest Pembroke Pines included milling resurfacing, roadway widening, median <br />construction, pavement reconstruction, drainage, permitting, sidewalk, signing and maintenance of traffic. <br />City of Pembroke Pines Project Manager: Paul Edelstein (954) 437 -1115. <br />I -95 at Oakland Park Blvd, FDOT, Broward County, Florida. Design of the widening of Oakland Park <br />Blvd and ramp reconstruction for the I -95 interchange to provide for triple left turns from the southbound <br />j to eastbound ramp and triple right turns on the northbound to eastbound ramp. Signalization, lighting, <br />bridge widening, signing and pavement markings and utility coordination. FDOT Project Manager: Fausto <br />Gomez, P.E. (954) 777 -4466. <br />SR -A1A from West McArthur Boulevard to Hutchinson House West, Martin County, Florida. Acting as <br />Engineer of Record Mr. Pippitt was in responsible charge of all design elements of the roadway design. <br />j Specifically related to Design Group 3.2 and 7.1 for the milling and resurfacing and widening of this 2 lane <br />rural roadway. FDOT Project Manager: Fernando Morales, P.E. (954) 777 -4687. <br />3 SR -845 Powerline Road from Oakland Park Boulevard to 29th Street, Broward County, Florida. <br />Acting as Engineer of Record for the milling, resurfacing median modification safety project. FDOT Project <br />Manager: Fausto Gomez, P.E. (954) 777 -4466. <br />SR- 704 /Okeechobee Boulevard from Jog Road to Florida's Turnpike, Palm Beach County, Florida <br />,3 (1/13/03 - 1/24/05). Acting as Engineer of Record Mr. Pippitt was in responsible charge of all design <br />elements of the roadway design. Specifically related to Design Group 3.3, Mr. Pippitt designed the <br />maintenance of traffic plan for the section of Florida's Turnpike to facilitate the construction of two new <br />pedestrian overpasses. Palm Beach County Project Manager: Morton Rose, P.E. (561) 684 -4048. <br />I -95 Weigh -in- Motion Stations Design, FDOT, Martin County, Florida. Design for construction of two <br />weigh stations on I -95 in Martin County for FDOT's Motor Carrier Compliance Office. Blend of roadway and <br />site development included grading, paving, drainage, architectural, lighting, permitting, utilities, signali- <br />zation, weigh -in- motion instrumentation, surveillance system and lighting dissipation system. I was <br />working in the capacity of Project Manager for FDOT reporting to Robert Bostian, P.E. (954) 777 -4427. <br />I -95 HOV from Forest Hill Boulevard to South of Southern Boulevard, Palm Beach County, Florida. <br />Design for the addition of HOV lanes on this section I -95. Project included milling and resurfacing, <br />widening, drainage, permitting, utilities, lighting, retaining walls, and bridge widening. I was working in <br />the capacity of Project Manager for FDOT reporting to Robert Bostian, P.E. (954) 777 -4427. <br />I -95 HOV from North of Southern Boulevard to North of Congress Avenue, Palm Beach County, <br />Florida. Design for the addition of HOV lanes on this section I -95. Project included milling and resurfacing, <br />widening, drainage, permitting, utilities, lighting, retaining walls, and replacement of two bridges crossing <br />I -95. I was working in the capacity of Project Manager for FDOT reporting to Robert Bostian, P.E. (954) <br />777 -4427. <br />SR- 805 /SR -5 Dixie Highway /Olive Avenue Corridor Improvements. These seven projects along US -1 <br />were designed in a cooperative effort between the FDOT and the City of West Palm Beach to facilitate <br />needed roadway improvements and redevelopment efforts in the City. These projects included milling and <br />resurfacing, pavement reconstruction, drainage, permitting curb and gutter, sidewalk, utility construction <br />and relocation, signing and signalization. The projects also provided for traffic calming and aesthetic <br />enhancements: roadway narrowing, decorative lighting, raised intersection design, landscaped bulb -outs <br />and the construction of circular plaza. I was working in the capacity of Project Manager for FDOT reporting <br />to Robert Bostian, P.E. (954) 777 -4427. <br />Page 3114 <br />