<br />Calvin, Giordano & Associates, Inc.
<br />E X C E P T 1 0 N A L 5 0 L U T 1 0 N S
<br />Raymond Pippitt, PE, Page 2
<br />Pembroke Roadway Corridor Improvements, Pembroke Pines, Florida. These improvements to seven
<br />project segments in southwest Pembroke Pines included milling resurfacing, roadway widening, median
<br />construction, pavement reconstruction, drainage, permitting, sidewalk, signing and maintenance of traffic.
<br />City of Pembroke Pines Project Manager: Paul Edelstein (954) 437 -1115.
<br />I -95 at Oakland Park Blvd, FDOT, Broward County, Florida. Design of the widening of Oakland Park
<br />Blvd and ramp reconstruction for the I -95 interchange to provide for triple left turns from the southbound
<br />j to eastbound ramp and triple right turns on the northbound to eastbound ramp. Signalization, lighting,
<br />bridge widening, signing and pavement markings and utility coordination. FDOT Project Manager: Fausto
<br />Gomez, P.E. (954) 777 -4466.
<br />SR -A1A from West McArthur Boulevard to Hutchinson House West, Martin County, Florida. Acting as
<br />Engineer of Record Mr. Pippitt was in responsible charge of all design elements of the roadway design.
<br />j Specifically related to Design Group 3.2 and 7.1 for the milling and resurfacing and widening of this 2 lane
<br />rural roadway. FDOT Project Manager: Fernando Morales, P.E. (954) 777 -4687.
<br />3 SR -845 Powerline Road from Oakland Park Boulevard to 29th Street, Broward County, Florida.
<br />Acting as Engineer of Record for the milling, resurfacing median modification safety project. FDOT Project
<br />Manager: Fausto Gomez, P.E. (954) 777 -4466.
<br />SR- 704 /Okeechobee Boulevard from Jog Road to Florida's Turnpike, Palm Beach County, Florida
<br />,3 (1/13/03 - 1/24/05). Acting as Engineer of Record Mr. Pippitt was in responsible charge of all design
<br />elements of the roadway design. Specifically related to Design Group 3.3, Mr. Pippitt designed the
<br />maintenance of traffic plan for the section of Florida's Turnpike to facilitate the construction of two new
<br />pedestrian overpasses. Palm Beach County Project Manager: Morton Rose, P.E. (561) 684 -4048.
<br />I -95 Weigh -in- Motion Stations Design, FDOT, Martin County, Florida. Design for construction of two
<br />weigh stations on I -95 in Martin County for FDOT's Motor Carrier Compliance Office. Blend of roadway and
<br />site development included grading, paving, drainage, architectural, lighting, permitting, utilities, signali-
<br />zation, weigh -in- motion instrumentation, surveillance system and lighting dissipation system. I was
<br />working in the capacity of Project Manager for FDOT reporting to Robert Bostian, P.E. (954) 777 -4427.
<br />I -95 HOV from Forest Hill Boulevard to South of Southern Boulevard, Palm Beach County, Florida.
<br />Design for the addition of HOV lanes on this section I -95. Project included milling and resurfacing,
<br />widening, drainage, permitting, utilities, lighting, retaining walls, and bridge widening. I was working in
<br />the capacity of Project Manager for FDOT reporting to Robert Bostian, P.E. (954) 777 -4427.
<br />I -95 HOV from North of Southern Boulevard to North of Congress Avenue, Palm Beach County,
<br />Florida. Design for the addition of HOV lanes on this section I -95. Project included milling and resurfacing,
<br />widening, drainage, permitting, utilities, lighting, retaining walls, and replacement of two bridges crossing
<br />I -95. I was working in the capacity of Project Manager for FDOT reporting to Robert Bostian, P.E. (954)
<br />777 -4427.
<br />SR- 805 /SR -5 Dixie Highway /Olive Avenue Corridor Improvements. These seven projects along US -1
<br />were designed in a cooperative effort between the FDOT and the City of West Palm Beach to facilitate
<br />needed roadway improvements and redevelopment efforts in the City. These projects included milling and
<br />resurfacing, pavement reconstruction, drainage, permitting curb and gutter, sidewalk, utility construction
<br />and relocation, signing and signalization. The projects also provided for traffic calming and aesthetic
<br />enhancements: roadway narrowing, decorative lighting, raised intersection design, landscaped bulb -outs
<br />and the construction of circular plaza. I was working in the capacity of Project Manager for FDOT reporting
<br />to Robert Bostian, P.E. (954) 777 -4427.