|
Calvin, Giordano & Associates, Inc.
<br />1 E% C E P 1 1 0 N A L S 0 L U T 1 0 N 5
<br />JENNA CHAMBERLAIN, PE
<br />Roadway /Highway Design
<br />SUMMARY OF QUALIFICATIONS
<br />Ms. Chamberlain has over six years of experience and has worked on projects from
<br />beginning of design to project close out and supporting documents, including
<br />EDUCATION
<br />correspondence and coordination with all involved parties. Her experience includes
<br />B.S., Civil Engineering
<br />design for drainage, storm water facilities, roadways, signing and pavement markings,
<br />Florida State University
<br />plans preparation, traffic control plans, and storm water pollution prevention control
<br />Magna Cum Laude
<br />plans. Her experience also includes overall project coordination, design, permitting,
<br />utility coordination, participation in the quality control process, electronic delivery, and
<br />PROFESSIONAL
<br />local agency program (LAP) coordination.
<br />REGISTRATION
<br />State of Florida, PE,
<br />PROJECT EXPERIENCE
<br />No. 69035
<br />Hallandale Beach NE Quadrant Drainage Study & Improvements, Hallandale Beach,
<br />FL, Project Engineer. Ms. Chamberlain acted as project engineer and worked on the
<br />PROFESSIONAL
<br />design and permitting of the project. There are a number of drainage facilities within the
<br />ASSOCIATION
<br />200 plus acre project area with limited conveyance capacity and high head loss. Using
<br />American Society of
<br />ICPR, CGA modeled a proposed system of two pump stations connected to sixteen wells
<br />Civil Engineers
<br />j
<br />while maintaining the existing gravity wells and gravity outfall. These sixteen new wells
<br />Florida Engineering Society
<br />will be pressurized with fifteen (15) feet of head in order to produce the necessary
<br />discharge into the G3 aquifer. FDEP and the Broward County Environmental Resource
<br />National Society of
<br />Department and FDEP have permitted the project.
<br />Professional Engineers
<br />Greater Hollywood Chamber
<br />College Avenue Improvements, Davie, FL - Civil Engineering. Ms. Chamberlain
<br />of Commerce, Board of
<br />assisted in the design and permitting Of .60 miles of improvements for the Town of
<br />Directors
<br />Davie including taking a two lane rural section with drainage to a four lane urban
<br />section with bike lanes, curbing, median, sidewalk, a new drainage system. lighting„
<br />CERTIFICATIONS
<br />landscaping, and irrigation. The project was permitted through Central Broward Water
<br />Advanced Work Zone Traffic
<br />Control District (CBWCD), South Florida Water Management District (SFWMD), and
<br />Control
<br />Broward County Highway Construction and Engineering Division.
<br />FICE /FDOT Roadway Design
<br />Basin 5 Storm Water Master Plan, Dania Beach, FL: Project Engineer -Ms.
<br />Training Expo
<br />Chamberlain designed and permitted the improvements contained in the
<br />recommendation of the Storm Water Master Plan of Basin 5.. The proposed drainage
<br />improvements consist of four duplex pump stations, more than 20,000 linear feet of
<br />higher capacity storm sewer to improve storm water conveyance, more efficient
<br />discharge outfall systems and exfiltration trenches to improve area water quality. The
<br />retrofitted drainage system within the Basin 5 drainage areas attenuates the storm
<br />water runoff and reduces the frequency and duration of flooding.
<br />I -95 Design /Build, FDOT District IV, Palm Beach County, Florida. Prepared signing
<br />and pavement marking plans as well as participated in QA /QC process. FDOT Project
<br />Manager: Henry Oaikhena, PE, (954) 777 -4445. (2004)
<br />Okeechobee Boulevard, Palm Beach County, Florida. Prepared roadway plans,
<br />signing and pavement marking plans, MOT, as well as drainage details. Also participated
<br />in QA /QC process. FDOT Project Manager: Ronald Wallace (954) 777 -4641. (2004-
<br />2005)
<br />Page 31 15
<br />
|