|
Calvin, Giordano & Associates, Inc.
<br />E X C E P T 1 0 N A L 5 0 L U T 1 0 N 5
<br />A
<br />Jenna Chamberlain, PE, Page 2
<br />SR 820 /Pines Boulevard, Broward County, Florida. Roadway design including adding an additional
<br />through lane, adjusting medians, adding bus bays, drainage modifications, ADA upgrades and milling and
<br />resurfacing. Signing and pavement marking design for Pines Boulevard including reconfiguration of two
<br />mall entrances. Overall project coordination including preparing roadway and signing and pavement
<br />marking plans, calculating quantities using Geopak, participating in QA /QC process, engineering during
<br />construction, and project close out. This project included multiple projects and funding sources extending
<br />from 136th Avenue to Douglas Road, funding included a LAP project, a JPA project, and permit project.
<br />FDOT Project Manager: John Thompson (954) 777-4680.(2004-2008)
<br />SR 7 /SR 441 Safety Improvements, Fort Lauderdale, Florida. Involved in QA /QC process, electronic
<br />delivery for production complete, sign panel design, signing and pavement markings plans, and post design
<br />r services. FDOT Project Manager: Ronald Wallace (954) 777 -4641. (2005 -2007)
<br />SR 820 /Pines Boulevard at the I -75 interchange urbanization and ramp realignment (LAP),
<br />Broward County, Florida. Signing and pavement marking design for the reconfiguration of the I -75
<br />interchange at Pines Boulevard /SR 820 including new ramp alignment, design of cantilever signs, and new
<br />signalized intersections. Prepared signing and pavement marking plans, calculated quantities using
<br />Geopak, participated in QA /QC process for roadway and signalization plans, and post- design services.
<br />FDOT Client Liaison: Leslie Wetherell (954) 777 -4438. (2007 - Currently under construction)
<br />SR -93 /Alligator Alley milling, resurfacing and shoulder widening, Broward County, Florida. Signing
<br />and pavement marking design for toll plaza within project limits as well as participation in quality control
<br />for roadway and signing and pavement marking plans. Calculated quantities coordinated all plan
<br />components including landscape, structural, and geotechnical, successfully completed all electronic
<br />delivery submittals of plans to FDOT District 4, and provided extensive coordination with adjacent project,
<br />which was let under the same contract. FDOT Project Manager: Ronald Wallace (954) 777 -4641. (2006 -
<br />Currently under construction)
<br />Hiatus Road at SR 820 /Pines Boulevard intersection improvements, Pembroke Pines, Florida.
<br />Prepared roadway and signing and pavement marking plans for the addition of dual left turn lanes on
<br />Hiatus Road, both NB and SB approaches to Pines Boulevard. Coordination with BCTED, signalization sub-
<br />consultant, the City of Pembroke Pines, and the FDOT for successful permitting of the proposed plan set.
<br />(2008)
<br />Bonaventure Boulevard Improvements, Weston, Florida. Prepared roadway, signing and pavement
<br />marking, SWPPP, and MOT plans for the addition of four left turn lanes on Bonaventure Blvd. Design
<br />assistance and Quality Control review of proposed roundabouts for the intersection of Bonaventure Blvd
<br />with Saddle Club road as well as Blatt Blvd. (project currently in design)
<br />Page 3116
<br />
|