My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CGA
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-01) Traffic Engineering Services
>
Responses
>
CGA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2012 2:45:01 AM
Creation date
1/11/2012 4:54:05 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Traffic Engineering
Bid No. (xx-xx-xx)
11-11-01
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s; <br />j L Calvin, p Giordano & Associates, Inc. <br />E X C E P T I O N A L 5 0 L LI T I O N S <br />4 <br />Robert Jackson, PSM, Page Z <br />with conventional sub - traverses utilized for finding or setting property corners and locating <br />improvements. At the completion of the AUTOCAD drawing all aspects of the project were reviewed for <br />completeness and compliance with Minimum Technical Standards (NITS). <br />Dania Cove, Dania Beach, Florida. Prepared a Boundary and Topographical survey which delineated <br />mean high water along the Dania Cut -Off Canal. All in accordance with the State of Florida minimum <br />technical standards for land surveys as defined by Chapter 5J -17.05 of the Florida Administrative Code. <br />J City of Lauderhill, Florida, Storm Water locations -GPS. Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br />r City of Weston, Florida, Sign Inventory -GPS (City of Weston Surveyor). Project Manager responsible <br />for all survey aspects of this project. Project involved locations of City signage. This included informational <br />signs and all traffic signs throughout the City. Survey Crews cataloged, height, type of sign and condition <br />with the Global Positioning System (GPS). Performed quality control throughout the project. Coordinated <br />weekly meetings to assure the project was on time and on budget. <br />City of Weston, Florida, Storm Water Improvements -GPS. Project Manager responsible for all survey <br />aspects of this project. Project involved locations of catch basins and outfalls with the Global Positioning <br />System (GPS). Performed quality control throughout the project. Coordinated weekly meetings to assure <br />the project was on time and on budget. <br />Page 3118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.