My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Chen-Moore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:46:49 PM
Creation date
1/12/2012 2:55:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />--, <br /> <br />\ <br />, <br /> <br />NW 191st Street Area Drainage Improvements, Miami Gardens, Florida <br /> <br />Chen Moore and Associates (CMA) was asked by the City of Miami Gardens to design the stormwater <br />improvements for the residential area from NW 9th Avenue to NW 10th Place and from NW 191st Street <br />to NW 193rd Street. The design had a total construction budget of over $400,000 per a grant received <br />by the City. CMA evaluated the existing site conditions to strategically design roadway, drainage and <br />sidewalk improvements to meet the most critical needs of the City and maximize the value of their <br />construction budget. <br /> <br />The design included strategic placement of exfiltration trench at key areas of the existing residential <br />area, while looking for opportunities to interconnect portions of existing systems that has been working <br />independently. Strategic areas were chosen to be regarded per the results of the drainage modeling. <br />The design considered elements related to the pedestrian paths and parallel parking adjacent to Norland <br />High School. The project scope included government permitting, bidding services and construction <br />administration to support the efforts of City staff. <br /> <br />CMA has worked with the City on a number of additional projects under our continuing services contract <br />providing similar roadway and stormwater engineering services as well other services. Example <br />additional projects CMA has successfully completed for the City of Miami Gardens include: <br /> <br />. Miami Gardens GIS Stormwater Atlas <br />. NW 38 Court Drainage Improvements <br />. 133.003 NW 38 Ave to NW 38 Place (NW 208 Street to NW 209 Street) Drainage Improvements <br />. 133.002 NW 19th Ave To NW 21st Ave: from NW 191 Tr To NW 26th St Drainage Improvements <br />. Le Jeune Bridge Design Build Criteria Package <br /> <br />Client <br />City of Miami Gardens <br />Mariana Pitiriciu, P.E. <br />1050 N.W. 163rd Dr. <br />Miami Gardens, FL 33169 <br />(305) 622-8000 x3386 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.