My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Chen-Moore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:46:49 PM
Creation date
1/12/2012 2:55:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br /> <br />As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing <br />ICPR Modeling and GIS to meet and/or exceed required stormwater Level of Services standards. The <br />proposed stormwater design included the introduction of catch basins, and stormwater piping to <br />effectively collect and route the stormwater to 16 drainage gravity wells and stormwater pump station <br />with overflow outfall connections to Biscayne Bay. Due to the environmental sensitivity of Biscayne <br />Bay design and implementation of water quality treatment measures was an important consideration <br />and design factor of the system prior to outfall to the Bay and was closely coordinated with regulatory <br />agencies during the permitting process. <br /> <br />Client <br />City of Miami Beach <br />Carla Dixon <br />777 17th Street, 3rd Floor <br />Miami Beach, FL 33139 <br />(305) 673-7071 <br /> <br />City Center Right of Way and Utility Improvement Project, Miami Beach, FL <br /> <br />Chen Moore and Associates surveying, planning, geotechnical investigation, design, <br />modeling, permitting, preparation of construction <br />documents, bid and award and construction engineering <br />and inspection services for infrastructure improvements <br />within the public right-of-way areas of the City Center <br />neighborhood of Miami Beach. <br /> <br />:#J! <br />,._, ,. -1 The project encompasses approximately 24,000 LF of <br />': .I' '1 L ROW infrastructure improvements including water main <br />" J <br />--,_, - replacements, sanitary sewer upgrades, stormwater <br />""j a 1"-::1 ~";, '- ""'7'< drainage improvements, pavingandgrading,streetscaping <br />.Ii ;1: ~ enhancements, landscaping improvements, lighting <br />_t.:iIIiI.ir^'~, .._(~...J improvements, and roadway reconstruction. This project <br />also required extensive coordination with the public, <br />adjacent CRAs, historic districts and various regulatory agencies. <br /> <br />As part of the proposed stormwater and drainage services, extensive analysis was conducted utilizing <br />ICPR Modeling and GIS to meet and/or exceed required <br />stormwater Level of Services standards. The proposed stormwater <br />design included the introduction of catch basins and stormwater <br />piping to effectively collect and route the stormwater to 16 <br />drainage gravity wells with overflow outfall to Dade Canal. Water <br />quality treatment was an important consideration and design <br />factor of the system to ensure that appropriate treatment was <br />provided prior to discharge to the gravity wells and outfalls. <br /> <br />Client <br />City of Miami Beach <br />Carla Dixon <br />777 17th Street, 3rd Floor <br />Miami Beach, FL 33139 <br />(305) 673-7071 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.