Laserfiche WebLink
CHeRE <br />., &ASSOCIATES <br /> <br />Peter M Moore, PE, LEED AP <br />President and CEO <br /> <br />Education <br />Bachelor of Science, Civil Engineering, <br />University of Florida, 1997 <br />Master of Engineering, Civil Engineering, <br />University of Florida, 2004 <br /> <br />Registration <br />Professional Engineer, Florida, 58709, 2002 <br /> <br />Professional Affiliations <br />. American Society of Civil Engineers <br />. Florida Engineering Society <br />. Florida Stormwater Association <br />. National Society of Professional <br />Engineers <br /> <br />Certifications <br />Certified Stormwater Inspector <br />LEED Accredited Professional <br /> <br />)summary <br />As the President of the firm, Mr. Moore is <br />ultimately responsible for all day to day <br />operations of the firm. Mr. Moore has a broad <br />range of civil engineering experience including <br />stormwater management, roadway design, <br />sanitary collection improvements, pump station <br />rehabilitation, transportation engineering <br />enhancements, water and reclaimed water <br />consulting along with all other phases of civil <br />engineering design and neighborhood <br />improvements. Additionally, Mr. Moore serves <br />as the Assistant City Engineer for the City of <br />Coral Springs and is the spokesperson for the <br />City's Engineering Division. Finally, Mr. Moore <br />serves on the firm's QA/QC Committee ensuring <br />the consistency of the quality product <br />throughout the firm. <br /> <br />Project Experience <br />Miami Beach - South Pointe Phase <br />III/IV IV - ROW Improvement Project. <br />Chen Moore and Associates is the prime <br />consultant and is responsible for providing <br />surveying, planning, geotechnical investigation, <br />design, permitting, preparation of construction <br /> <br />documents, bid and award and construction <br />engineering and inspection services for <br />infrastructure improvements within the public <br />right of way areas of the South Pointe III/IV/V <br />neighborhood of Miami Beach. The project <br />encompasses approximately 19,000 LF of ROW <br />infrastructure improvements including water <br />main replacements, stormwater drainage <br />improvements, paving & grading, streetscaping <br />enhancements, landscaping improvements, <br />lighting improvements, and roadway <br />reconstruction. This project also required <br />extensive coordination with the public, adjacent <br />CRAs, historic districts and various regulatory <br />agencies. <br /> <br />As part of the proposed stormwater and <br />drainage services, extensive analysis was <br />conducted utilizing ICPR Modeling and GIS to <br />meet and/or exceed required stormwater Level <br />of Services standards. The proposed <br />stormwater design included the introduction of <br />catch basins and storm water piping to <br />effectively collect and route the stormwater to <br />sixteen drainage gravity wells and a stormwater <br />pump station with overflow outfall connections <br />to Biscayne Bay. Due to the environmental <br />sensitivity of Biscayne Bay design and <br />implementation of water quality treatment <br />measures was an important consideration and <br />design factor of the system prior to outfall to <br />the Bay and was closely coordinated with <br />regulatory agencies during the permitting <br />process. <br /> <br />Miami Lakes Lake Patricia Roadway & <br />Drainage Improvements. Chen Moore and <br />Associates is implementing drainage <br />improvements identified on the most recent <br />Town of Miami Lakes Storm water Master Plan <br />for approximately one square mile of an existing <br />residential neighborhood near Lake Patricia in <br />southern Miami Lakes near Ludlam Road. <br />Services include utility coordination, schematic <br />and final design phases, government <br />permitting, bidding assistance, construction <br /> <br />www.chenmoore.com <br />