Laserfiche WebLink
<br />CH~RE <br /> <br />) &ASSOClATES <br />administration and statements of work <br />completion. The final design included <br />approximately 1,900 LF of exfiltration trench <br />and rehabilitation/upsizing of 6 existing outfalls. <br />CMA is also assisting Miami Lakes with the <br />acquisition of potential grant opportunities for <br />funding the construction of the proposed <br />improvements. <br /> <br />Miami Beach Sunset Islands 1 & 2. Chen <br />Moore and Associates designed stormwater, <br />water main, and roadway improvements for the <br />City of Miami Beach Sunset Islands 1 & 2 <br />neighborhood. As part of the proposed <br />storm water and drainage services, extensive <br />analysis was conducted utilizing ICPR Modeling <br />and GIS to meet and/or exceed required <br />storm water Level of Service standards. The <br />proposed stormwater design included the <br />introduction of catch basins, exfiltration trench <br />and stormwater piping to effectively collect <br />storm water, provide water quality treatment <br />and route the stormwater to existing overflow <br />outfalls to Biscayne Bay. As part of the project, <br />an existing condition assessment of the existing <br />)outfalls was conducted and rehabilitation and <br />upsizing of the existing outfalls as required was <br />proposed. This stormwater project due to its <br />outfall to Biscayne Bay required extensive <br />permitting coordination with Miami-Dade <br />County DERM, South Florida Water Management <br />District and the US Army Corps of Engineers. <br /> <br />Village of Pinecrest SW 73rd Rd from SW <br />93rd Tr to SW 72 Ave. Chen Moore and <br />Associates assisted with drainage improvements <br />for SW 73rd Rd. Chen Moore and Associates <br />also developed an ICPR Model to determine <br />maximum flood elevation, provided a technical <br />memorandum and submitted final plans. Chen <br />Moore and Associates worked with the Village of <br />Pinecrest to review existing conditions and <br />evaluate the existing stormwater Level of <br />Service (LOS) within the SW 73rd Road <br />residential neighborhood from SW 93rd Terrace <br />to SW 72nd Avenue due to resident concerns. <br />CMA conducted an analysis of the area, <br />provided recommendations for drainage <br />improvements to meet Village LOS standards, <br />and provided full design, permitting and <br />construction document preparation services. As <br /> <br />part of the project, CMA also assisted the <br />Village in conducting public information <br />meetings and evaluating the bids received. <br /> <br />North Miami Beach NE 168th Street <br />Roadway Improvements. Chen Moore and <br />Associates provided consulting engineering <br />services for the NE 168 Street (between NE 18 <br />Avenue and NE 19 Avenue) and NE 18 Avenue <br />(between NE 168 Street and NE 169 Street) <br />right of way improvements. The scope of the <br />project included addressing drainage concerns, <br />providing new curbing and street paving, <br />replacing/adding sidewalks, providing new <br />paved parking areas which were gravel, and <br />providing landscaping areas for future plantings <br />to be completed by the City. <br /> <br />Miami Gardens NW 38th Ct Drainage <br />Improvements. Chen Moore and Associates <br />designed stormwater improvements for the <br />residential area of NW 38th Avenue to NW 38th <br />Place & NW 208th Street to NW 209th Street. <br />The design had a total construction budget of <br />$175,000 per a grant received by the City. CMA <br />evaluated the existing site conditions to <br />strategically design roadway, drainage and <br />sidewalk improvements to meet the most <br />critical needs of the City and maximize the <br />value of their construction budget. The project <br />scope included government permitting, bidding <br />services and construction administration to <br />support the efforts of City staff. <br /> <br />Village of Pinecrest SW 64th Ct Drainage <br />Improvements. Chen Moore and Associates <br />worked with the Village of Pinecrest to review <br />existing conditions and evaluate the existing <br />stormwater Level of Service (LOS) within the <br />SW 64th Court residential cul-de-sac <br />neighborhood south of Kendall Drive due to <br />resident concerns. CMA conducted an analysis <br />of the area, provided recommendations for <br />drainage improvements to meet Village LOS <br />standards, and provided full design, permitting <br />and construction document preparation <br />services. As part of the project, CMA also <br />assisted the Village in conducting public <br />information meetings and evaluating the bids <br />received. <br /> <br />www.chenmoore.com <br />