Laserfiche WebLink
<br />1 <br /> <br />CHeRE <br /> <br />-~) &ASSOCIATES <br />Miami Beach Sunset Islands 1 & 2. Chen <br />Moore and Associates designed stormwater, <br />water main, and roadway improvements for the <br />City of Miami Beach Sunset Islands 1 & 2 <br />neighborhood. As part of the proposed <br />stormwater and drainage services, extensive <br />analysis was conducted utilizing ICPR Modeling <br />and GIS to meet and/or exceed required <br />storm water Level of Service standards. The <br />proposed storm water design included the <br />introduction of catch basins, exfiltration trench <br />and stormwater piping to effectively collect <br />stormwater, provide water quality treatment <br />and route the stormwater to existing overflow <br />outfalls to Biscayne Bay. As part of the project, <br />an existing condition assessment of the existing <br />outfalls was conducted and rehabilitation and <br />upsizing of the existing outfalls as required was <br />proposed. This stormwater project due to its <br />outfall to Biscayne Bay required extensive <br />permitting coordination with Miami-Dade <br />County DERM, South Florida Water Management <br />District and the US Army Corps of Engineers. <br /> <br />Miami Gardens NW 191st Street Drainage <br />)ImprOvements. Chen Moore and Associates <br />(CMA) was asked by the City of Miami Gardens <br />to design the stormwater improvements for the <br />residential area from NW 9th Avenue to NW <br />10th Place and from NW 191st Street to NW <br />193rd Street. The design had a total <br />construction budget of over $400,000 per a <br />grant received by the City. CMA evaluated the <br />existing site conditions to strategically design <br />roadway, drainage and sidewalk improvements <br />to meet the most critical needs of the City and <br />maximize the value of their construction <br />budget. The design considered elements <br />related to the pedestrian paths and parallel <br />parking adjacent to Norland High School. The <br />project scope included government permitting, <br />bidding services and construction administration <br />to support the efforts of City staff. <br /> <br />Marathon MS4 Permitting. Chen Moore and <br />Associates provided consulting engineering <br />services for the submittal of the FDEP NPDES <br />MS4 annual report for the City of Marathon. <br />CMA also worked with the City to obtain the <br />renewal of the MS4 permitting for the current <br />cycle which included development of best <br /> <br />management practice goals, developing public <br />informational brochures, updating the City's <br />current storm water ordinance to reflect current <br />regulations and coordinating supplemental <br />information with the permitting agencies. <br /> <br />Monterra Development University Drive <br />Improvements. The Chen Moore Team <br />designed a new right turn lane and bus bay <br />from University Drive (FDOT SR 817) into the <br />future entrance to the Town Center component <br />of the Monterra Development in Cooper City <br />(north of Sheridan Street). The project <br />required the design and construction of two - 9 <br />foot box culverts (approximately 120 LF), the <br />demolition and relocation of +/- 2,000 LF of <br />water main from Davie Utilities and doubled the <br />width of +/- 2,000 LF of the existing Central <br />Broward Water Control District (CBWCD) canal <br />along University Drive. Coordination efforts <br />were conducted with the CBWCD, Town of Davie <br />Engineering, Town of Davie Fire Marshall, Town <br />of Davie Utilities, Cooper City Utilities, Broward <br />County and the Florida Department of <br />Transportation. The project was completed <br />simultaneously with the University Drive Canal <br />Expansion Project. Chen Moore and Associates' <br />services included roadway, drainage, earthwork <br />and utility design; government permitting; <br />conducting public bidding for the Monterra <br />Community Development District (CDD); <br />construction observation and closeout services. <br /> <br />Village of Pinecrest Suncrest Dr & Moss <br />Ranch Rd Drainage Analysis. Chen Moore <br />and Associates worked with the Village of <br />Pinecrest to review existing conditions and <br />evaluate the existing stormwater Level of <br />Service (LOS) within the Suncrest Drive & Moss <br />Ranch Road area due to resident concerns. <br />CMA conducted an analysis of the area, <br />proVided recommendations for drainage <br />improvements to meet Village LOS standards, <br />and provided full design, permitting and <br />construction document preparation services. As <br />part of the project, CMA also assisted the <br />Village in conducting public information <br />meetings, bidding the project, evaluating the <br />bids received and providing periodic site <br />observations during construction. <br /> <br />www.chenmoore.com <br />