My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Chen-Moore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:46:49 PM
Creation date
1/12/2012 2:55:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CH~RE <br /> <br />) &ASSOCIATES <br />Miami Beach Sunset Islands 1 & 2. Chen <br />Moore and Associates designed stormwater, <br />water main, and roadway improvements for the <br />City of Miami Beach Sunset Islands 1 & 2 <br />neighborhood. As part of the proposed <br />storm water and drainage services, extensive <br />analysis was conducted utilizing ICPR Modeling <br />and GIS to meet and/or exceed required <br />storm water Level of Service standards. The <br />proposed stormwater design included the <br />introduction of catch basins, exfiltration trench <br />and stormwater piping to effectively collect <br />stormwater, provide water quality treatment <br />and route the stormwater to existing overflow <br />outfalls to Biscayne Bay. As part of the project, <br />an existing condition assessment of the existing <br />outfalls was conducted and rehabilitation and <br />upsizing of the existing outfalls as required was <br />proposed. This stormwater project due to its <br />outfall to Biscayne Bay required extensive <br />permitting coordination with Miami-Dade <br />County DERM, South Florida Water Management <br />District and the US Army Corps of Engineers. <br /> <br />Miami-Dade County Pine Shores Drainage <br />)Improvement Project. Chen Moore & <br />Associates provided engineering design services <br />for the Pine Shores Drainage Improvement <br />Project. Chen Moore and Associates analyzed <br />the existing drainage systems and designed a <br />system to handle the 5 year - 1 day storm <br />event. <br /> <br />Miami Beach City Center Right of Way <br />Improvement Project. Chen Moore and <br />Associates is the prime consultant and was <br />responsible for providing surveying, planning, <br />geotechnical investigation, design, permitting, <br />preparation of construction documents, bid and <br />award and construction engineering and <br />inspection services for infrastructure <br />improvements within the public right of way <br />areas of the City Center neighborhood of Miami <br />Beach. The project encompasses approximately <br />24,000 LF of ROW infrastructure improvements <br />including water main replacements, sanitary <br />sewer upgrades, stormwater drainage <br />improvements, paving & grading, streetscaping <br />enhancements, landscaping improvements, <br /> <br />lighting improvements, and roadway <br />reconstruction. This project also required <br />extensive coordination with the Public, adjacent <br />CRAs, historic districts and various regulatory <br />agencies. <br /> <br />As part of the proposed stormwater and <br />drainage services, extensive analysis was <br />conducted utilizing ICPR Modeling and GIS to <br />meet and/or exceed required stormwater Level <br />of Services standards. The proposed stormwater <br />design included the introduction of catch basins <br />and storm water piping to effectively collect and <br />route the stormwater to 16 drainage gravity <br />wells with overflow outfall to Dade Canal. Water <br />quality treatment was an important <br />consideration and design factor of the system to <br />ensure that appropriate treatment was provided <br />prior to discharge to the gravity wells and <br />outfalls. <br /> <br />Village of Pinecrest SW 104th Street <br />Drainage Improvements. Chen Moore and <br />Associates was contracted by the Village of <br />Pinecrest to provide design and permitting <br />related services to address drainage concerns <br />along the north side of SW 104th Street at the <br />intersection with SW 77th Avenue. Proposed <br />drainage improvements included drainage <br />structures and exfiltration trench within the <br />public right of way to address the drainage <br />problem. <br /> <br />North Miami Beach NE 168th Street <br />Roadway Improvements. Chen Moore and <br />Associates provided consulting engineering <br />services for the NE 168 Street (between NE 18 <br />Avenue and NE 19 Avenue) and NE 18 Avenue <br />(between NE 168 Street and NE 169 Street) <br />right of way improvements. The scope of the <br />project included addressing drainage concerns, <br />providing new curbing and street paving, <br />replacing/adding sidewalks, providing new <br />paved parking areas which were gravel, and <br />providing landscaping areas for future plantings <br />to be completed by the City. <br /> <br />www.chenmoore.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.