My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Chen-Moore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:46:49 PM
Creation date
1/12/2012 2:55:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CHeRE <br />) &ASSOCIATES <br /> <br />Meghan T Wells, EIT, LEED AP <br />Associate Engineer <br /> <br />Education <br />Bachelor of Science, Architectural Engineering, <br />University of Miami, 2009 <br /> <br />Registration <br />Engineer In Training, Florida, 100206954, 200S <br /> <br />Professional Affiliations <br />. American Society of Civil Engineers <br /> <br />Certifications <br />LEED AP <br /> <br />Summary <br />Ms. Wells serves as an Associate Civil Engineer <br />for Chen Moore and Associates. She is a <br />graduate from the University of Miami where <br />she served as the President of the American <br />Society of Civil Engineers (ASCE) Student <br />Chapter. She became Chen Moore and <br />)Associates' first LEED Accredited Professional <br />while she was an intern in August of 200S. Her <br />experience includes roadway design, <br />stormwater modeling/design, GIS, permitting, <br />storm water master plans and coordination of <br />grant funding. <br /> <br />Project Experience <br /> <br />North Miami Beach NE 18th Ave Between <br />NE 167th & 168th Streets. Chen Moore and <br />Associates provided consulting engineering <br />services for the NE lSth Avenue between NE 167 <br />th Street and NE 16Sth Street right of way <br />improvements. The scope of the project <br />included addressing drainage concerns, <br />providing new curbing and street paving, <br />replacing/adding sidewalks, providing new <br />paved parking areas which were gravel, and <br />providing landscaping areas for future plantings <br />to be completed by the City. <br /> <br />Miami Lakes Lake Patricia Roadway & <br />Drainage Improvements. Chen Moore and <br />Associates is implementing drainage <br />improvements identified on the most recent <br /> <br />Town of Miami Lakes Stormwater Master Plan <br />for approximately one square mile of an existing <br />residential neighborhood near Lake Patricia in <br />southern Miami Lakes near Ludlam Road. <br />Services include utility coordination, schematic <br />and final design phases, government <br />permitting, bidding assistance, construction <br />administration and statements of work <br />completion. The final design included <br />approximately 1,900 LF of exfiltration trench <br />and rehabilitation/upsizing of 6 existing outfalls. <br />CMA is also assisting Miami Lakes with the <br />acquisition of potential grant opportunities for <br />funding the construction of the proposed <br />improvements. <br /> <br />Miami Gardens NW 191st Street Drainage <br />Improvements. Chen Moore and Associates <br />(CMA) was asked by the City of Miami Gardens <br />to design the stormwater improvements for the <br />residential area from NW 9th Avenue to NW <br />10th Place and from NW 191st Street to NW <br />193rd Street. The design had a total <br />construction budget of over $400,000 per a <br />grant received by the City. CMA evaluated the <br />existing site conditions to strategically design <br />roadway, drainage and sidewalk improvements <br />to meet the most critical needs of the City and <br />maximize the value of their construction <br />budget. The design considered elements <br />related to the pedestrian paths and parallel <br />parking adjacent to Norland High School. The <br />project scope included government permitting, <br />bidding services and construction administration <br />to support the efforts of City staff. <br /> <br />Fort Lauderdale-Hollywood International <br />Airport Stormwater Master Plan Update. <br />Chen Moore and Associates worked on the <br />Stormwater Master Plan update for the Fort <br />Lauderdale-Hollywood International Airport. <br />This project included gathering all existing <br />information available from previous permits, <br />reports and studies and confirming their <br />accuracy for use in the existing conditions <br />model; preparing the existing conditions model <br /> <br />www.chenmoore.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.