My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Chen-Moore & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
Chen-Moore & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:46:49 PM
Creation date
1/12/2012 2:55:43 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering Svcs
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />) <br /> <br />1 <br />I <br /> <br />, <br /> <br />4. Approach / Methodology <br />Chen Moore and Associates has over 25 years of experience in providing consulting civil engineering, <br />environmental engineering, landscape architecture and planning services for local public sector <br />clients throughout the state of Florida. Utilizing our extensive experience on similar street and drainage <br />projects with public sector clients in Miami-Dade County including projects for the Town of Miami <br />Lakes, the City of Miami Gardens, the City of North Miami Beach, the City of Miami Beach, the Village <br />of Pinecrest and Miami Dade County we have developed proven, efficient, cost effective methods to <br />deliver projects to our clients on time and within budget. We work as an extension of our clients as a <br />trusted advisor familiar with the technical aspects of a project, the regulatory/permitting requirements <br />and in consideration and communication with all stakeholders involved to ensure a successful project <br />on time and within budget. We ensure that our clients remain well informed throughout the process <br />with frequent communication and regular project updates and also that our staff is accessible to handle <br />any client needs that arise throughout the project. The following details the approach that CMA intends <br />to utilize for the successful completion of this project for the City of Sunny Isles Beach. <br /> <br />Project Scope <br />In the undertaking of any project, CMA understands the need to provide innovative and sustainable <br />solutions on time and within budget. Paramount in achieving a successful project on time and within <br />budget is to clearly define the scope and goals of the current project. In defining the scope of the <br />project, the following are some of the factors that will be considered: <br /> <br />. Project goals, timeline and budget <br />. Any unique characteristics and considerations (resident/hotline complaint logs, special <br />characteristics, etc.) <br />. Existing available information (available utility atlases, as-builts, operating reports, etc.) <br />. Additional information that will need to be obtained (survey, geotechnical studies, traffic studies, <br />etc.) <br />. Potential impacts of construction to: parking, bus routes, emergency access and vehicular flow; <br />pedestrian routes; community events; existing utilities; etc. <br />. Project stakeholders (affected residents, HOAs, public agencies, etc.) <br />. Regulatory authorities having jurisdiction and permitting agencies <br />. Project funding <br />. Construction requirements and limitations <br /> <br />At the outset of the project it is necessary to clearly define the scope of the project and the project <br />goals for all concerned parties to ensure the successful completion of the project. <br /> <br />Existing Site Assessment & Planning <br />In preparation of this proposal, CMA has already completed a number of existing site assessment tasks <br />for this project to become familiar with the project area. Additionally, these completed initial tasks <br />will result in time savings to the project and to the City of Sunny Isles Beach as we have procured the <br />following information and are ready to implement it into the proposed project: <br />
The URL can be used to link to this page
Your browser does not support the video tag.