Laserfiche WebLink
<br />) <br /> <br />C IT Y <br /> <br /> <br />SUN N Y <br /> <br />ISLES <br /> <br />BEACH <br /> <br />o F <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />) <br /> <br />DESIGN/BUILD FOR 1.595 FINAL DESIGN, BROWARD COUNTY, FL - FDOT, DISTRICT 4 <br />(AECOMIDRAGADOS) <br />Project Engineer involved with the drainage design for several sections of the corridor. She assisted with the design <br />services for the preparation of construction documents for major freeway improvements in Broward County, Florida. The <br />design tasks include exfiltration trench design, storm sewer design and analysis, and both wet and dry retention <br />stormwater management pond designs. The design involves the use of spreadsheets, ICPR, ASAD and Microstation. <br />SR-997/KROME AVENUE, BRIDGE HYDRAULIC REPORT, MIAMI.DADE COUNTY, FL - FDOT, DISTRICT 6 <br />Project Engineer - She designed the drainage hydraulic alternatives for the bridge crossing the Miami Canal C-6 at SR- <br />997 Krome Avenue, using the HEC-RAS model. The SR-997 (Krome Avenue) Bridge crossing over the Miami Canal (C- <br />6) (Existing Bridge No. 870134) was replaced with one northbound and one southbound road bridge. RJ Behar was <br />contracted by the FOOT to perform the hydraulic and scour analyses and prepare the Bridge Hydraulic Report for the <br />project. <br />1-75/GRIFFIN ROAD INTERCHANGE - BROWARD COUNTY, FL <br />Drainage/Permitting Engineer - The scope of the project included design modifications to the interchange drainage, <br />which included modification of inlets and existing pipes, new control structures within the existing ponds to provide <br />treatment of additional impervious areas and modification of the existing ponds/detention areas. <br />NORTH BROWARD COUNTY NEIGHBORHOOD IMPROVEMENT - BROWARD COUNTY WATER & <br />WASTEWATER DEPARTMENT <br />Drainage Engineer - She was in charge of designing, and proposed installation of a comprehensive stormwater <br />management system, for a portion of the North Broward County Neighborhood Improvement Project (NCNIP). This <br />project included assessment of the existing drainage system, identifying problem areas, and offering a suitable solution <br />for existing flood problems. She also prepared the permit package including SFWMD, FOOT and Broward County. <br />DISTRICT ENGINEERS PERMIT REVIEWS - CENTRAL BROWARD WATER CONTROL DISTRICT <br />Technical Support - Provided hydrologic-hydraulic expertise and reviewed technical issues regarding proposed projects <br />SHADY BANKS/SEPTIC AREA NUMBER 5 - CITY OF FORT LAUDERDALE, FL <br />Project Engineer for the conversion of a septic system community to a sanitary sewer system. She also prepared the <br />water permit package. <br />SISTRUNK BOULEVARD FROM FEDERAL HIGHWAY TO 27th AVENUE - CITY OF FORT LAUDERDALE, FL <br />Project Engineer who prepared contract documents for over 2 miles of new water lines; prepared all the design <br />calculation, cost estimates specifications and water permit package. <br />HOLLYWOOD BOULEVARD (SR.S20) FROM SR.A1A TO US.1- FDOT DISTRICT 4 <br />Drainage Engineer - Ms. Aponte worked on the design of drainage improvements for the project. <br />TURNPIKE WIDENING JOHNSON STREET TO GRIFFIN ROAD - FDOT TURNPIKE ENTERPRISE <br />Drainage Engineer - This project was to widen the Turnpike mainline from 6 to 8-lanes. This project involved milling, <br />resurfacing and widening of the Turnpike, which included the Stormwater Management design of all surrounding area of <br />this highway portion and the highway itself. Ms. Aponte worked on the drainage design and permitting packages. <br />KROME AVENUE BRIDGE HYDRAULIC REPORT (BHR) MIAMI.DADE COUNTY, FL- FDOT, DISTRICT 6 <br />Hydraulic Analysis - She designed drainage Hydraulic alternatives for the bridge crossing the Miami Canal C-6 at SR- <br />997 Krome Avenue using the HEC-RAS model. <br />MIRAMAR CANAL SYSTEM EVALUATION - CITY OF MIRAMAR, FL <br />Project Engineer - She performed the site evaluations to determine the existing conditions of the canal system. She <br />evaluated the drainage basin, siltation and deterioration of seawalls. Ms. Aponte performed basin evaluation using the <br />AdlCPR model. She studied the canal system interaction with the TURNPIKE/HEFT interchange drainage system. <br />ESTERO BAY NUTRIENT LOAD ASSESSMENT - SOUTH FLORIDA WATER MANAGEMENT DISTRICT <br />Ms. Aponte assessed and developed a nutrient load assessment model for planners, regulators and local stakeholders <br />to evaluate various alternatives to protect and enhance water quality within the basin and related impacts on Estero Bay <br />using the WAMView model. <br />NW 7th/9th AVENUE CONNECTOR, PROJECT DEVELOPMENT & ENVIRONMENTAL STUDY - CITY OF FORT <br />LAUDERDALE, BROWARD COUNTY, FUFDOT, DISTRICT 4 <br />Environmental Engineer - She performed the re-evaluation of the contamination screening and evaluation report in <br />accordance with FOOT/PD&E 23 CFR 771. The re-evaluation identified significant environmental impacts, which may <br />have changed after previous environmental reports. Conclusions and recommendations were also provided in order to <br />continue to the next project phase or Phase II of the Environmental Assessment before project execution. <br /> <br />Si R.J.Behar <br /> <br />R. J. BEHAR & COMPANY, INC. 1 RFQ No. 11-11-02 113 <br />