My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
R.J. Behar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:59:20 PM
Creation date
1/12/2012 3:47:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />) <br /> <br /> <br />) <br /> <br />HIALEAH HIGH SCHOOL PARKING GARAGE - CIVIL PLANS - CITY OF HIALEAH, FL <br />Project Engineer - Responsible for the preparation of civil plans related to water and sewer design, drainage design, <br />notes and details for the parking garage, within the City of Hialeah. <br />FEMA ROADWAY AND DRAINAGE IMPROVEMENTS - MIAMI, FL <br />Design Engineer in charge of providing services to the Miami-Dade Public Works Department for the implementation of <br />drainage improvements in areas of Dade County that were flooded by Hurricane Irene and the No-name storm and <br />determined eligible for FEMA funds to correct the damage. These projects involved the provision of drainage systems to <br />prevent future flooding as well as roadway reconstruction or resurfacing to repair damage to the roadways from being <br />inundated by water resulting in base damage. <br />HIALEAH CITY HALL PARKING GARAGE - CITY OF HIALEAH, FL <br />Project Engineer for the civil engineering design services required for the proposed City of Hialeah Parking Garage. The <br />services included the paving layout and design, the drainage/site design, coordination of the utilities and the provision of <br />new utility services, as well as the preparation of a demolition plan. <br />SR-S36/SR-112/MIAMIINTERMODAL CENTER (MIC) INTERCONNECTOR <br />Project Engineer - This project involved the evaluation of the existing drainage system designed by MIC Management <br />Group and performed analysis of the proposed drainage system (the MIC design as existing). The proposed interchange <br />will include the Interconnector from SR 836 south to SR 112 in the north, access ramps from Central Boulevard to Le <br />Jeune Road northbound and access ramp from Le Jeune Road southbound to SR 836. <br />NEW CHILDREN'S COURTHOUSE - FEDERAL GSA <br />Project Engineer - Responsible for the preparation of an Environmental, Resource Permit, (ERP) Application Package <br />essential for the construction of the project. The civil engineering design services employed for the project included, a <br />paving layout and design, drainage/site design, water and sewer design, coordination of utilities and the stipulation of <br />new utility services. <br />SOUTHSIDE & HARDY PARK - CITY OF FORT LAUDERDALE, FL <br />Project Engineer - Responsible for the preparation of an Environmental Resource Permit (ERP) Application Package <br />required for the construction of the project. The civil engineering design services presented for the project included, the <br />paving layout and design, drainage/site design, water and sewer design, coordination of utilities and the provision of new <br />utility services. <br />QQQ-1- MIAMI DADE COUNTY PUBLIC SCHOOLS <br />Project Engineer - Responsible for the preparation of an Environmental Resource Permit (ERP) Application Package <br />required for the construction of the project. The civil engineering design services offered for the project included, paving <br />layout and design, drainage/site design, water and sewer design, coordination of utilities and provision of new utility <br />services. Furthermore she was responsible for the coordination of client, consultant's design team and agencies having <br />jurisdiction for the project. <br />OVERTOWN NW 3RD AVENUE BUSINESS CORRIDOR STREETS CAPE PROJECT - CITY OF MIAMI DEPARTMENT <br />OF CAPITAL IMPROVEMENT AND TRANSPORTATION <br />Project Designer - Responsible for the design drawings to make improvements to NW 3rd Avenue from NW 8th Street to <br />NW 14th Street. The civil engineering services provided for the project included a 12" water main updating design, <br />coordination of the utilities and provisions for new utility services. <br />COUNTRY WALK, BASIN 2 AND 3 DRAINAGE & ROADWAY IMPROVEMENTS - MIAMI-DADE COUNTY'S <br />DEPARTMENT OF ENVIRONMENTAL RESOURCES MANAGEMENT (DERM) <br />Project Engineer - Responsible for the preparation of construction documents and drainage reports. The civil design <br />services required for the evaluation of the existing drainage system and the new drainage system through the use of <br />French drains and two outfalls on the Black Creek Canal. The analysis of the existing and proposed conditions was <br />done with ICPR software. The scope of services included the coordination of utilities having an impact on the project <br />site. <br />CITY OF HIALEAH COURTHOUSE - CITY OF HIALEAH, FL <br />Project Engineer for the civil engineering design services required for the proposed City of Hialeah Courthouse. The <br />services included the paving layout and design, the drainage/site design, the coordination of the utilities and the <br />provision of new utility services, as well as the preparation of a demolition plan. <br /> <br />IQI R .1.Behar <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 115 <br />
The URL can be used to link to this page
Your browser does not support the video tag.