Laserfiche WebLink
r) <br /> <br />CITY OF <br /> <br /> <br />SUNNY <br /> <br />ISLES <br /> <br />BEACH <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />PAOLA RIVEROS, EI <br />DRAINAGE ANALYSiS/DRAINAGE PLANS <br /> <br />EDUCATION: B.S. Civil Engineering, Florida International University, Miami, Florida, April 2001 <br />PROFESSIONAL REGISTRATIONS: E.I. Florida No.100007604, 2002; P.E. Washington, DC No. 905769, 2010 <br />TRAINING/CERTIFICATIONS: Drainage Design using ASAD; FOOT CADD Update Training Seminar; Bentley <br />MicroStation V8 User Update; ICPR Hands-On Training Seminar, Streamline Technologies, Inc.; Design of Storm <br />Sewers and Pavement Drainage, Water Resources Learning Center; FOOT CADD Update Training Seminar; FDOT <br />PPM Design Update Training; Bentley Geopack Conference; GIS Training <br />YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 - Present <br /> <br />ENGINEERING EXPERIENCE <br />Ms. Riveros has been responsible for the preparation of roadway plans, drainage, and site plans throughout South <br />Florida. She has assisted in drainage computations for FOOT and City projects. She has also performed construction <br />cost estimates for improvements that included street construction, buildings construction, and landscaping projects. Her <br />responsibilities have included the preparation of drawings in MicroStation and AutoCAD for civil and roadway projects. <br /> <br />At RJ Behar, Ms. Riveros is responsible for support in drainage and permitting projects. She drafted and performed <br />revisions to site, utility, drainage, and landscaped plans. Ms. Riveros has more than ten years of experience. She has <br />extensive experience in design of French drains and injection well systems. <br /> <br />) <br /> <br />RELEVANT EXPERIENCE <br />DESIGN/BUILD FOR 1-595 FINAL DESIGN, BROWARD COUNTY, FL - FDOT, DISTRICT 4 (AECOMIDRAGADOS) <br />Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration <br />trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. <br />The design involved the use of spreadsheets, ICPR, ASAD and Microstation <br />NORTH COUNTY NEIGHBORHOOD IMPROVEMENT PROJECT - BROWARD COUNTY, FL <br />Project Engineer in charge of drainage design and permitting. <br />NW 87th AVENUE (SR-973/GALLOWAY ROAD) MIAMI-DADE COUNTY, FL - FDOT, DISTRICT 6 <br />Project Engineer - She prepared the drainage plans for new construction of a major arterial. The scope includes final <br />design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction. <br />SR-A1A RESURFACING PROJECT, PALM BEACH COUNTY, FL - FDOT, DISTRICT 4 <br />Project Designer for RRR project, from the Boynton Inlet Bridge to SR-802 (Lake Worth). The project included milling <br />and resurfacing for 4 miles and reconstruction of 1 mile of a major rural roadway, as well as drainage improvements, <br />coastal drainage studies, pavement marking and signing, overhead signing plans, lighting plans, three signal locations, <br />bridge plans, wetland mitigation, public involvement, design documentation and landscape plans. <br />POWERLlNE ROAD (SR-845) PALM BEACH COUNTY, FL - FDOT, DISTRICT 4 <br />Project Designer - The project included milling and resurfacing of 3 miles of a major collector, 8 signal upgrades, safety <br />improvements and miscellaneous drainage improvements. <br />SR-5/US-1 RESURFACING, BOCA RATON, FL - FDOT, DISTRICT 4 <br />Project Engineer Designer - The project consisted of milling and resurfacing the existing pavement; upgraded signal <br />pedestrian features to current ADA standards. The scope also included new signing and pavement markings and <br />upgrading landscaping. <br />US-1 (FEDERAL HIGHWAY) HALLANDALE BEACH, FL - FDOT DISTRICT 4 <br />Project Designer - This RRR project went from the County Line to Hallandale Beach Boulevard. This project included <br />the design of a 0.8 miles, six-lane, urban, divided highway as well as minor drainage Improvements. <br />HOLLYWOOD BOULEVARD (SR-820) FROM SR-A1A TO US-1 - FDOT, DISTRICT 4 <br />Project Engineer for the preparation of drainage plans, including coordination with utilities. <br />SOUTHERN BOULEVARD (SR-80) DRAINAGE DESIGN - FDOT, DISTRICT 4 <br />Project Engineer - She performed area calculations and input data into AdlCPR stormwater model. She performed <br />floodplain volume compensation calculations. <br /> <br />q~ R.j.Behar <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02116 <br />