|
r)
<br />
<br />CITY OF
<br />
<br />
<br />SUNNY
<br />
<br />ISLES
<br />
<br />BEACH
<br />
<br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS
<br />
<br />PAOLA RIVEROS, EI
<br />DRAINAGE ANALYSiS/DRAINAGE PLANS
<br />
<br />EDUCATION: B.S. Civil Engineering, Florida International University, Miami, Florida, April 2001
<br />PROFESSIONAL REGISTRATIONS: E.I. Florida No.100007604, 2002; P.E. Washington, DC No. 905769, 2010
<br />TRAINING/CERTIFICATIONS: Drainage Design using ASAD; FOOT CADD Update Training Seminar; Bentley
<br />MicroStation V8 User Update; ICPR Hands-On Training Seminar, Streamline Technologies, Inc.; Design of Storm
<br />Sewers and Pavement Drainage, Water Resources Learning Center; FOOT CADD Update Training Seminar; FDOT
<br />PPM Design Update Training; Bentley Geopack Conference; GIS Training
<br />YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 - Present
<br />
<br />ENGINEERING EXPERIENCE
<br />Ms. Riveros has been responsible for the preparation of roadway plans, drainage, and site plans throughout South
<br />Florida. She has assisted in drainage computations for FOOT and City projects. She has also performed construction
<br />cost estimates for improvements that included street construction, buildings construction, and landscaping projects. Her
<br />responsibilities have included the preparation of drawings in MicroStation and AutoCAD for civil and roadway projects.
<br />
<br />At RJ Behar, Ms. Riveros is responsible for support in drainage and permitting projects. She drafted and performed
<br />revisions to site, utility, drainage, and landscaped plans. Ms. Riveros has more than ten years of experience. She has
<br />extensive experience in design of French drains and injection well systems.
<br />
<br />)
<br />
<br />RELEVANT EXPERIENCE
<br />DESIGN/BUILD FOR 1-595 FINAL DESIGN, BROWARD COUNTY, FL - FDOT, DISTRICT 4 (AECOMIDRAGADOS)
<br />Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration
<br />trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs.
<br />The design involved the use of spreadsheets, ICPR, ASAD and Microstation
<br />NORTH COUNTY NEIGHBORHOOD IMPROVEMENT PROJECT - BROWARD COUNTY, FL
<br />Project Engineer in charge of drainage design and permitting.
<br />NW 87th AVENUE (SR-973/GALLOWAY ROAD) MIAMI-DADE COUNTY, FL - FDOT, DISTRICT 6
<br />Project Engineer - She prepared the drainage plans for new construction of a major arterial. The scope includes final
<br />design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction.
<br />SR-A1A RESURFACING PROJECT, PALM BEACH COUNTY, FL - FDOT, DISTRICT 4
<br />Project Designer for RRR project, from the Boynton Inlet Bridge to SR-802 (Lake Worth). The project included milling
<br />and resurfacing for 4 miles and reconstruction of 1 mile of a major rural roadway, as well as drainage improvements,
<br />coastal drainage studies, pavement marking and signing, overhead signing plans, lighting plans, three signal locations,
<br />bridge plans, wetland mitigation, public involvement, design documentation and landscape plans.
<br />POWERLlNE ROAD (SR-845) PALM BEACH COUNTY, FL - FDOT, DISTRICT 4
<br />Project Designer - The project included milling and resurfacing of 3 miles of a major collector, 8 signal upgrades, safety
<br />improvements and miscellaneous drainage improvements.
<br />SR-5/US-1 RESURFACING, BOCA RATON, FL - FDOT, DISTRICT 4
<br />Project Engineer Designer - The project consisted of milling and resurfacing the existing pavement; upgraded signal
<br />pedestrian features to current ADA standards. The scope also included new signing and pavement markings and
<br />upgrading landscaping.
<br />US-1 (FEDERAL HIGHWAY) HALLANDALE BEACH, FL - FDOT DISTRICT 4
<br />Project Designer - This RRR project went from the County Line to Hallandale Beach Boulevard. This project included
<br />the design of a 0.8 miles, six-lane, urban, divided highway as well as minor drainage Improvements.
<br />HOLLYWOOD BOULEVARD (SR-820) FROM SR-A1A TO US-1 - FDOT, DISTRICT 4
<br />Project Engineer for the preparation of drainage plans, including coordination with utilities.
<br />SOUTHERN BOULEVARD (SR-80) DRAINAGE DESIGN - FDOT, DISTRICT 4
<br />Project Engineer - She performed area calculations and input data into AdlCPR stormwater model. She performed
<br />floodplain volume compensation calculations.
<br />
<br />q~ R.j.Behar
<br />
<br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02116
<br />
|