Laserfiche WebLink
<br />" <br /> <br />1 <br /> <br />C [ T Y <br /> <br /> <br />SUN N Y <br /> <br />ISLES <br /> <br />BEACH <br /> <br />o F <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />) <br /> <br />BLUE HERON BOULEVARD - FDOT DISTRICT 4 <br />Drainage Designer - She was responsible for the preparation of drainage plans. <br />ALTON ROAD (SR-907) - FDOT DISTRICT 6 <br />Project Engineer who prepared the roadway plans for 4 miles of a 3R project as well as drainage structure sheets and <br />details. <br />KINGS HIGHWAY (SR.713) RESURFACING - FDOT DISTRICT 4 <br />Project Engineer - She assisted in the preparation of the 3R report. She prepared the Summary of Crash Analysis. <br />ANDREWS AVENUE - FDOT DISTRICT 4 (KEITH & SCHNARS, PA) <br />Project Engineer - Preparation of pond sitting report. <br />PALM AVENUE FINAL DESIGN FROM OKEECHOBEE ROAD TO 21st STREET - CITY OF HIALEAH, FL <br />Project Engineer - Responsible for the preparation of construction drawings for roadway reconstruction and <br />improvements on Palm Avenue. <br />NORTHLAKE BOULEVARD BRIDGE OVER THE LOXAHATCHEE SLOUGHS - PALM BEACH COUNTY, FL - FDOT <br />DISTRICT 4 <br />Project Engineer - Developed the preliminary HEC-RAS model for the new channel. Scope of services consisted of <br />bridge design, drainage design, roadway improvements and permitting. RJ Behar is designing the relocation of 1,310 <br />feet of 20 inch water main and 1,299 feet of 16 inch force main. The new water main and force main will be relocated on <br />the new bridge. RJ Behar prepared all the details and structural design to accommodate the new utilities on the bridge. <br />NEIGHBORHOOD PARTICIPATION PROGRAM - CITY OF SUNRISE, FL <br />Project Engineer - She prepared cost estimates for eighteen neighborhood improvement projects. The project included <br />performing field investigations to determine the project scope to estimate the quantities and cost for the improvements. <br />VARIOUS COMMUNITIES - CITY OF SUNRISE, FL <br />Project Engineer - She prepared cost estimates for 18 communities as part of the Neighborhood Participation Program. <br />The scope of the project included new entry signs, landscaping, lighting, sidewalks, pavers and general improvements. <br />ANSIN BOULEVARD - CITY OF HALLANDALE BEACH, FL <br />Project Engineer for the reconstruction of one mile of City streets. <br />SW 62nd COURT - TOWN OF SOUTHWEST RANCHES, FL <br />Project Engineer - She prepared roadway reconstruction plans and drainage plans. <br />NE 15th AVENUE - CITY OF FORT LAUDERDALE, FL <br />Project Engineer - Responsible for the master plan and public Involvement for a 0.8 mile roadway in Fort Lauderdale, <br />Florida, which included resurfacing plans, marking and signing plans, landscape plans. <br />NW/NE 13th STREET - CITY OF FORT LAUDERDALE, FL <br />Project Engineer - Responsible for the master plan and public Involvement for a 2.1 mile roadway in Fort Lauderdale, <br />Florida, which included resurfacing plans, marking and signing plans, landscape plans. <br />C.4 CANAL FLOOD PROTECTION PROJECT, CITY OF SWEETWATER, FL - SOUTH FLORIDA WATER <br />MANAGEMENT DISTRICT <br />Project Engineer for drainage design along C-4 canal north bank and flood protection cut-off wall. <br />W. 77th STREET - CITY OF HIALEAH, FL <br />Project Engineer - She prepared roadway reconstruction plans and drainage plans. <br />W. 37th STREET - CITY OF HIALEAH, FL <br />Project Engineer - She prepared roadway reconstruction plans and drainage plans. <br />W. 33rd STREET PHASES I AND 11- CITY OF HIALEAH, FL <br />Project Engineer - She prepared roadway reconstruction plans and drainage plans. <br />W. 74th STREET - CITY OF HIALEAH, FL <br />Project Engineer - She prepared roadway reconstruction plans and drainage plans. <br /> <br />a1[ <br />q. R.J.Behar <br /> <br />R. J. BEHAR & COMPANY, INC. 1 RFQ No. 11-11-02 117 <br />