<br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS
<br />
<br />)
<br />
<br />NANETTE AKYAZ
<br />DRAINAGE ANALYSiS/DRAINAGE PLANS
<br />
<br />EDUCATION: A.A. Degree, Broward Community College, Davie, Florida, 1992
<br />PROFESSIONAL REGISTRATIONS: Not Applicable
<br />TRAINING/CERTIFICATIONS: 2002 FOOT CAD Update Training Seminar; 2002 FOOT PPM Design Update
<br />Training; Florida International University - AutoCAD Release 12; FDOT/FICE - Load and Resistance Factor Design
<br />(LRFO) Training; Geopak Road 1 Training
<br />YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 - Present
<br />
<br />ENGINEERING EXPERIENCE
<br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and
<br />civil engineering projects. She has 12 years of experience in plans preparation on civil engineering projects.
<br />
<br />)
<br />
<br />RELEVANT EXPERIENCE
<br />EAST 4th AVENUE STREET ASSESSMENT - CITY OF HIALEAH, FL
<br />Responsible for the drafting of driveways, sidewalks and ADA ramps; curb and gutter, drainage, pavement, and
<br />utilities. The scope consisted of General engineering services for the assessment of sidewalks, ADA compliance and
<br />cost estimate for repairs or reconstruction of sidewalks of two segments of this roadway; from Hialeah Drive to East
<br />21 st Street and from East 32nd Street to East 53rd Street.
<br />PALM AVENUE (W. 45th STREET TO W. 47th STREET) - CITY OF HIALEAH, FL
<br />Roadway Designer - She prepared the plans for milling and resurfacing Palm Avenue from East 45th Street to East
<br />47th Street. The project also included adding curb ramps to comply with ADA standards, replacing sidewalk,
<br />driveways and curb and gutter as needed, cleaning, sealing and adjusting drainage manholes and inlets and signing
<br />and pavement markings
<br />DESIGN/BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL - FDOT DISTRICT 4
<br />Project Designer responsible for the production of roadway plans, signing and pavement marking plans and
<br />quantities for this design/build project. The scope of this project included roadway plans, drainage design, signing &
<br />marking plans and utility relocation plans. The design included the use of filter fabric and a thick sub-base in lieu of
<br />demucking the roadway.
<br />POWERLlNE ROAD (SR-845) PALM BEACH COUNTY, FL - FDOT DISTRICT 4
<br />Project Engineer responsible for the preparation of roadway quantities, computation book and transport input. The
<br />scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including;
<br />drainage design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations,
<br />structural plans (bridqe wideninq), a public involvement program and landscape improvements. The project also
<br />included a safety analysis and a signal assessment analysis.
<br />SR.A1A (FROM COUNTY ROAD TO FLAGLER MEMORIAL BRIDGE) PALM BEACH COUNTY, FL - FDOT,
<br />DISTRICT 4
<br />Roadway Designer - The project consisted of milling and resurfacing of 0.25 miles of a 4-lane divided highway for
<br />FOOT, District 4). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility
<br />relocation, as well as, the design and drafting of signing and markings and lighting plans including lighting
<br />calculations. She was in charge of the quantities input in the FOOT CES system.
<br />1.75/GRIFFIN ROAD INTERCHANGE, BROWARD COUNTY, FL - FDOT DISTRICT 4
<br />Roadway Designer - The scope consists of improvements including modifications to the interchange by realigning
<br />the 1-75 ramps to converge at a new signalized intersection. Her responsibilities include the geometrics, signing and
<br />pavement markings, signalization and long range estimates.
<br />NORTHLAKE BOULEVARD OVER THE LOXAHATCHEE SLOUGH - PALM BEACH COUNTY, FL
<br />Roadway Designer - The project consisted of reconstruction of a four lane divided highway, construction of a bridge,
<br />weir and walkway. She was responsible for the geometrics, signing and pavement markings, weir placement and
<br />grading of the channel and walkway, quantity calculations and cost estimates.