Laserfiche WebLink
<br />C [ T Y <br /> <br /> <br />SUNNY <br /> <br />ISLES <br /> <br />BEACH <br /> <br />o F <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />) <br /> <br />NANETTE AKYAZ <br />DRAINAGE ANALYSiS/DRAINAGE PLANS <br /> <br />EDUCATION: A.A. Degree, Broward Community College, Davie, Florida, 1992 <br />PROFESSIONAL REGISTRATIONS: Not Applicable <br />TRAINING/CERTIFICATIONS: 2002 FOOT CAD Update Training Seminar; 2002 FOOT PPM Design Update <br />Training; Florida International University - AutoCAD Release 12; FDOT/FICE - Load and Resistance Factor Design <br />(LRFO) Training; Geopak Road 1 Training <br />YEARS OF EXPERIENCE: 10 Years YEARS WITH RJ BEHAR: 2001 - Present <br /> <br />ENGINEERING EXPERIENCE <br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and <br />civil engineering projects. She has 12 years of experience in plans preparation on civil engineering projects. <br /> <br />) <br /> <br />RELEVANT EXPERIENCE <br />EAST 4th AVENUE STREET ASSESSMENT - CITY OF HIALEAH, FL <br />Responsible for the drafting of driveways, sidewalks and ADA ramps; curb and gutter, drainage, pavement, and <br />utilities. The scope consisted of General engineering services for the assessment of sidewalks, ADA compliance and <br />cost estimate for repairs or reconstruction of sidewalks of two segments of this roadway; from Hialeah Drive to East <br />21 st Street and from East 32nd Street to East 53rd Street. <br />PALM AVENUE (W. 45th STREET TO W. 47th STREET) - CITY OF HIALEAH, FL <br />Roadway Designer - She prepared the plans for milling and resurfacing Palm Avenue from East 45th Street to East <br />47th Street. The project also included adding curb ramps to comply with ADA standards, replacing sidewalk, <br />driveways and curb and gutter as needed, cleaning, sealing and adjusting drainage manholes and inlets and signing <br />and pavement markings <br />DESIGN/BUILD FOR THE RECONSTRUCTION OF SE 3rd STREET, BELLE GLADE, FL - FDOT DISTRICT 4 <br />Project Designer responsible for the production of roadway plans, signing and pavement marking plans and <br />quantities for this design/build project. The scope of this project included roadway plans, drainage design, signing & <br />marking plans and utility relocation plans. The design included the use of filter fabric and a thick sub-base in lieu of <br />demucking the roadway. <br />POWERLlNE ROAD (SR-845) PALM BEACH COUNTY, FL - FDOT DISTRICT 4 <br />Project Engineer responsible for the preparation of roadway quantities, computation book and transport input. The <br />scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including; <br />drainage design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, <br />structural plans (bridqe wideninq), a public involvement program and landscape improvements. The project also <br />included a safety analysis and a signal assessment analysis. <br />SR.A1A (FROM COUNTY ROAD TO FLAGLER MEMORIAL BRIDGE) PALM BEACH COUNTY, FL - FDOT, <br />DISTRICT 4 <br />Roadway Designer - The project consisted of milling and resurfacing of 0.25 miles of a 4-lane divided highway for <br />FOOT, District 4). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility <br />relocation, as well as, the design and drafting of signing and markings and lighting plans including lighting <br />calculations. She was in charge of the quantities input in the FOOT CES system. <br />1.75/GRIFFIN ROAD INTERCHANGE, BROWARD COUNTY, FL - FDOT DISTRICT 4 <br />Roadway Designer - The scope consists of improvements including modifications to the interchange by realigning <br />the 1-75 ramps to converge at a new signalized intersection. Her responsibilities include the geometrics, signing and <br />pavement markings, signalization and long range estimates. <br />NORTHLAKE BOULEVARD OVER THE LOXAHATCHEE SLOUGH - PALM BEACH COUNTY, FL <br />Roadway Designer - The project consisted of reconstruction of a four lane divided highway, construction of a bridge, <br />weir and walkway. She was responsible for the geometrics, signing and pavement markings, weir placement and <br />grading of the channel and walkway, quantity calculations and cost estimates. <br /> <br />'filir: R .J.Behar <br />~-~1l1 ~ <br /> <br />R. J. BEHAR & COMPANY, INC. 1 RFQ No. 11-11-02 119 <br />