|
<br />
<br />)
<br />
<br />NW 146th STREET/NORTH MIAMI AVENUE/S RIVER DRIVE - MIAMI-DADE COUNTY, FL
<br />Roadway Designer - She assisted in the preparation of layout and final construction plans for a roundabout based on
<br />Miami-Dade County roadway design criteria in the City of North Miami. The roundabout connects N. Miami Avenue,
<br />South River Drive and NW 146th Street. The purpose of the project was to provide traffic calming in this
<br />neighborhood.
<br />US-1/SR-S - ST. LUCIE COUNTY, FL - FDOT, DISTRICT 4
<br />Roadway Designer - Responsible for the signalization plans.
<br />1-9S PUMP STATION, PEMBROKE PARK, FL- FDOT, DISTRICT 4
<br />Roadway Designer - She prepared the roadway plans for reconstruction of 30th Avenue.
<br />US-1/SR-S, MIAMI-DADE COUNTY LINE TO HALLANDALE BEACH BOULEVARD - FDOT, DISTRICT 4
<br />Roadway Designer - She prepared the typical section package and quality control review.
<br />SR-80 CRESTWOOD TO 10Sth AVENUE - FDOT, DISTRICT 4
<br />Roadway Designer - She prepared the roadway, signing and marking and drainage plans.
<br />TOWN CENTER ROADWAY STUDY - CITY OF CORAL SPRINGS, FL
<br />Roadway Designer - She prepared layouts of the bus stations and connecting roadways for transit improvements.
<br />MILANDER PARK STREETSCAPE - CITY OF HIALEAH, FL
<br />Roadway Designer - She prepared master plans for East 47th and East 48th Street from Palm Avenue to East 1st
<br />Avenue.
<br />WILDE PARK - CITY OF HIALEAH, FL
<br />Roadway Designer - She prepared the site, paving and drainage design plans.
<br />BUCKY DENT PARK DESIGN - CITY OF HIALEAH, FL
<br />Roadway Designer - Responsible for the design to address flooding problems at the park.
<br />WEST 37th STREET - CITY OF HIALEAH, FL
<br />Roadway Designer - Responsible for the roadway plans for reconstruction of W 37th Street.
<br />E. 6th AVENUE (FROM E. 9th STREET TO HIALEAH DRIVE), E. Sth STREET (FROM E. 4th AVENUE TO E. 6th
<br />AVENUE), E. Sth STREET (FROM E. 6th AVENUE TO E. 8th AVENUE) - CITY OF HIALEAH, FL
<br />Roadway Designer - She was responsible for the drafting of roadway plans, drainage, traffic control, signalization,
<br />utility relocation, as well as the design and drafting of signing and markings plans and lighting including lighting
<br />calculations.
<br />E.1st AVENUE - CITY OF HIALEAH, FL
<br />Roadway Designer - She prepared roadway plans, drainage design, signing and marking, signal plans, conversion of
<br />overhead to underground utilities. The project consisted of the reconstruction of 1.6 miles of City Street, conversion
<br />from one-way to two-way traffic.
<br />E. 10th, 11th, 12th, 13th, 14th, 1Sth STREET (FROM PALM AVENUE TO EAST 1st AVENUE) - CITY OF HIALEAH, FL
<br />Roadway Designer - Prepared roadway plans, drainage design, signing and marking. The project consisted of
<br />reconstruction of approximately 3700 feet of City Street.
<br />E.10th, 11th, 12th, 13th, 14th, 1Sth (FROM EAST 1st AVENUE TO EAST 2nd AVENUE) - CITY OF HIALEAH, FL
<br />Roadway Designer - She prepared roadway plans, drainage design, signing and marking and utility coordination.
<br />The project consists of reconstruction of 3,700 feet of City Street.
<br />E. 16th, E. 17th, E. 18th, 19th, 20th (FROM PALM AVENUE TO EAST 1st AVENUE) - CITY OF HIALEAH, FL
<br />Roadway Designer - She was responsible for the roadway plans, drainage design, signing and marking and utility
<br />coordination. The project consists of reconstruction of 3,000 feet of City Streets.
<br />E. 16th, 18th, 19th, 20th STREET, CURTIS DRIVE (FROM EAST 1st AVENUE TO EAST 2nd AVENUE) - CITY OF
<br />HIALEAH, FL
<br />Roadway Designer - She prepared roadway plans, drainage design, signing plans, utility coordination. The project
<br />consisted of reconstruction 3700 feet of City Streets.
<br />
<br />)
<br />
<br />~;~ R.).Behar
<br />
<br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 I 20
<br />
|