Laserfiche WebLink
<br />CITY <br /> <br />o F <br /> <br />SUN N Y <br /> <br />ISLES <br /> <br />BEACH <br /> <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />SUGEILY PATXOT <br />) DRAINAGE ANALYSiS/DRAINAGE PLANS <br /> <br />ED U CA T 10 N: B.S. Civil Engineer, University of Puerto Rico, 2007 <br />PROFESSIONAL REGISTRATIONS: N/A <br />YEARS OF EXPERIENCE: 4 Years YEARS WITH RJ BEHAR: 2007 - Present <br /> <br />ENGINEERING EXPERIENCE <br />Ms. Patxot has a number of years experience performing as a Project Engineer for a range of water resource projects. At <br />RJ Behar, Ms. Patxot is responsible for plans preparation and the calculation of drainage designs. She has worked in <br />preparation of drainage projects as well as designing construction plans for sanitary sewers. <br /> <br />RELEVANT EXPERIENCE <br />SW 328th STREET FROM SW 152nd AVENUE TO SW 137th AVENUE - MIAMI.DADE COUNTY PUBLIC WORKS <br />Project Engineer - Ms. Patxot participated in the preliminary drainage design for the project. <br />SW 176th STREET FROM SW 107th AVENUE TO US.1- MIAMI.DADE COUNTY, FL <br />Project Engineer in charge of plans preparation. The scope of this project included master planning, feasibility analysis <br />and design. After the master planning was completed then roadway design including drainage, signing and marking <br />design proceeded. <br />1.595 FINAL DESIGN, BROWARD COUNTY, FL - FOOT, DISTRICT 4 (AECOM/DRAGADOS) <br />Project Engineer - Involved with developing the drainage master plan update, and assisted with the drainage design for <br />several sections of the corridor. Design tasks include exfiltration trench design, storm sewer design and analysis, and <br />both wet and dry retention stormwater management pond designs. The design involved the use of spreadsheets, ICPR, <br />ASAD and Microstation. <br />) BROADVIEW ESTATES BP 2 SANITARY SEWER COLLECTION - BROWARD COUNTY WATER AND <br />WASTEWATER DEPARTMENT <br />Designer - She devised plans and profiles for a sanitary gravity collection system for a complete neighborhood collection <br />structure. <br />STRUCTURE INSPECTION PROGRAM NON.STA STRUCTURES - SOUTH FLORIDA WATER MANAGEMENT <br />DISTRICT <br />Project Engineer - She coordinated the preparation of deliverables with inspectors. She followed up with QC comments <br />as well as client comments. She planned and prepared tracking charts for all deliverables. She occupied numerous <br />hours preparing inspection reports in coordination with an inspection team. <br />SR.A1A PALM BEACH COUNTY, FL - FOOT, DISTRICT 4 <br />Project Engineer - The scope consisted of roadway improvements along SR A1A, from Boynton Inlet Bridge to Lake <br />Worth Road. The project included a major drainage study and improvements, milling and resurfacing, signals, bridge <br />improvements, signing and marking plans. Ms. Patxot devised plan revisions during post design services. <br />C.4 CANAL FLOOD PROTECTION BELEN SECTION - SOUTH FLORIDA WATER MANAGEMENT DISTRICT <br />Project Engineer in charge of plans preparation for designing a f100dwall for flood protection intended for the area of <br />Belen in Miami-Dade. <br />NORTH COUNTY NEIGHBORHOOD IMPROVEMENT PROJECT - BROWARD COUNTY, FL <br />Project Engineer - This project consisted of drainage design, construction management and peer review. Ms. Patxot was <br />in charge of the plans preparation, drainage and quantity calculations. <br />HOLLYWOOD BOULEVARD/SR.820 (US.1 TO SR.A1A) - FOOT, DISTRICT 4 <br />Project Engineer in charge of organizing plans for Hollywood Boulevard in Hollywood. She furthermore assisted with <br />drainage calculations and the preparation of relevant reports. <br />CROWN LINEN LAUNDRY - HIALEAH, FL <br />Project Engineer - Responsible for the plans preparation of water and sewer systems. The scope of services included <br />data collection, water and sewer design and plans preparation. Ms Patxot, in addition, was responsible for obtaining <br />water and sewer permits from Miami-Dade County, Water and Sewer Department and the Department of Environmental <br />Resource Management. <br /> <br />lril! R .J.Behar <br />'-m' <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 I 21 <br />