Laserfiche WebLink
<br />f) <br /> <br />C [ T Y <br /> <br />SUN N Y <br /> <br /> <br />o F <br /> <br />ISLES <br /> <br />BEACH <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />DENNIS STANTON <br />SUE DIRECTOR <br /> <br />EDUCATION: BA Liberal Arts Old Westbury, NY (1985) <br />EXPERTISE: Surveying Subsurface Utility Engineering (SUE) Utility Coordination <br />PROFESSIONAL AFFILIATIONS: Miami-Dade County Utility Coordinating Council; Sunshine One Call of Florida; <br />Florida Utility Coordinating Committee Broward County Utility Coordinating Council; Subsurface Utility Engineering <br />Association; National Utility Locating <br />YEARS OF EXPERIENCE: 14 Years YEARS WITH FR ALEMAN & ASSOCIATES, INC.: 1996 - Present <br /> <br />EXPERIENCE <br />Mr. Stanton has specialized in utility coordinating, mapping and protection of subsurface utility systems for over 18 years. <br />He has relevant and recent work experience in designating, locating and plant protection projects. He has performed utility <br />investigations with a variety of electronic detection devices, survey equipment and air/vacuum excavators on numerous <br />projects throughout Florida, New York, Virginia and Maryland. He has supervised over 10,000 test holes and over <br />1,000,000 utility feet of designating. <br /> <br />) <br /> <br />PROJECT EXPERIENCE <br />DISTRICTWIDE SUBSURFACE UTILITY ENGINEERING, FDOT, DISTRICT 7 (2 CONSECUTIVE CONTRACTS: <br />8/2001 . 8/2006 & 7/2006 - 5/2011; 5/2011 - PRESENT) - Project Manager who provides all the necessary services to <br />designate, locate by excavation, survey and map existing surface and subsurface utilities to support the design of <br />construction plans on projects selected by the Department. He provides exact horizontal and vertical locations of existing <br />underground utilities by way of electromagnetic, sonic and other geophysical location techniques including vacuum <br />excavation. Contact: Mr. John Kubler No Longer with FDOT/Ms. Darling Calender (813) 975-6146 <br /> <br />DISTRICTWIDE UTILITY LOCATION SERVICES, FDOT, DISTRICT 6 (2009 - PRESENT) - FRA was recently awarded <br />this contract again, our previous contract ended in 12/2005. Mr. Stanton, as the Project Manager, facilitates a quick <br />response to the Department when ordering subsurface exploration services. He provides all the necessary services to <br />designate, locate by excavation, survey and map existing surface and subsurface utilities to support the design of <br />construction plans on projects selected by the Department. He provides exact horizontal and vertical locations of existing <br />underground utilities by way of electromagnetic, sonic and other geophysical location techniques including vacuum <br />excavation. Contact: Mr. Tony Soto (305) 470-5232 <br /> <br />DISTRICTWIDE UTILITY COORDINATION SERVICES, FDOT, DISTRICT 6 (2006 - 7/2011; 7/2011 - 7/2016) - Mr. <br />Stanton provides Utility Coordination services for this project. FRA has completed numerous major roadway projects <br />under this contract and also provides on-site services as needed. Tasks have included all phases of utility negotiations, <br />relocation and cost estimates all the way through to construction. Contact: Mr. Tony Soto (305) 470-5232 <br /> <br />DISTRICTWIDE UTILITY LOCATION SERVICES & DIW UNDERGROUND UTILITY SERVICES CONTRACT, FDOT , <br />DISTRICT 4 (11/2000 - OS/2011) - Project Manager who provides all the necessary services to designate, locate by <br />excavation, survey and map existing surface and subsurface utilities to support the design of construction plans on <br />projects selected by the Department. He provides exact horizontal and vertical locations of existing underground utilities <br />by way of electromagnetic, sonic and other geophysical location techniques including vacuum excavation. FRA has <br />been awarded two consecutive contracts! Contact: Mr. Ken Olson (954) 777-4563 <br /> <br />PORT OF MIAMI TUNNEL, FDOT, DISTRICT 6 (2009 - PRESENT) - FRA serves as a subconsultant to Jacobs on this <br />mega project, its budget is $1.5 billion. Mr. Stanton, as the Project Manager, facilitates a quick response to the Prime <br />and contractor when ordering subsurface exploration services. His team provides exact horizontal and vertical locations <br />of existing underground utilities by way of electromagnetic, sonic and other geophysical location techniques including <br />vacuum excavation. Contact Mr. Renato Marrero, Jacobs (305) 718-0599 <br /> <br />1.595 CORRIDOR ROADWAY IMPROVEMENTS, FDOT, DISTRICT 4 (04/2009 - PRESENT) - FRA serves as a <br />subconsultant to the ACS Dragados/EarthTech Team for this project. The area of this project extends from the 1- <br />75/Sawgrass Expressway interchange to the 1-595/1-95 interchange in central Broward County, Florida, for a total project <br /> <br /> <br />$~:;;,~~~ <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 127 <br />