Laserfiche WebLink
<br />C IT Y <br /> <br />o F <br /> <br />SUNNY <br /> <br />ISLES <br /> <br />BEACH <br /> <br /> <br />CIVIL ENGINEERING SERVICES TO DESIGN STREET AND DRAINAGE IMPROVEMENTS <br /> <br />~) <br /> <br />and anchored walls. He has also designed geogrid-reinforced embankments with MSE walls with an <br />overall height of 40 feet. <br /> <br />KEY PROJECTS <br /> <br />PORT OF MIAMI WHARF VI BULKHEAD EXTENSION - MIAMI-DADE COUNTY, FL <br />Senior Geotechnical Engineer in charge of the geotechnical scope for this Port of Miami project. His duties included <br />coordination with the personnel assigned to the project. The work included the field data collection and the bulkhead <br />geotechnical analysis. Performed the analysis of a wharf bulkhead system, 950 feet long for a maximum dredging <br />elevation at 52 feet, NGVD29. The bulkhead consisted of 46-inch diameter steel pipe piles spaced 8 feet apart. The <br />geotechnical analysis of the bulkhead system included the weight of one side of a gantry crane transferred through eight <br />wheels. The other side is supported on an independent pile system. <br /> <br />PORT OF MIAMI NORTH POMTOC YARD PAVEMENT AND SEABOARD MARINE YARD PAVEMENT - MIAMI. <br />DADE COUNTY, FL <br />Senior Geotechnical Engineer in charge of the geotechnical scope for this Port of Miami project. His duties included <br />coordination with the personnel assigned to the project. The work included the field data collection and the pavement <br />analysis. Provided pavement analysis was for rubber-tire gantry cranes and stacker-container loading machines. The <br />analysis included pavement thicknesses for the vehicles and per repetitions per year. Included recommendations, <br />specification for construction. <br /> <br />) <br /> <br />BICENTENNIAL PARK NEW BULKHEAD DESIGN - MIAMI-DADE COUNTY, FL <br />Senior Geotechnical Engineer in charge of the geotechnical services for this City of Miami project. His duties included <br />coordination with the personnel assigned to the project. The work included the field data collection and the design of <br />cantilever retaining walls and recommendations for sheetpile construction. Provided evaluation of the existing bulkhead <br />system that consisted of an old anchored steel sheet pile. The existing bulkhead was in poor conditions. The new system <br />consisted of a cantilever steel sheetpile with an oversized section modulus to avoid the use of anchor and minimize the <br />disturbance of contaminated soils behind the existing bulkhead. The new sheepile wall extended from the northeast <br />corner of Bicentennial Park with the MacArthur Causeway Bridge, continued along the east side of the park, the <br />American Airline Arena and ended near Dodge Island Bridge. <br /> <br />Ii;'; I <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 I 32 <br />