My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(11-11-02) Civil Engineering Services to Design Street & Drainage Improvements
>
Responses
>
R.J. Behar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 3:59:20 PM
Creation date
1/12/2012 3:47:54 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Civil Engineering
Bid No. (xx-xx-xx)
11-11-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-) <br /> <br /> <br />) <br /> <br /> <br />':-.. <br />! View of access to Intracoastal Waterway ~ <br /> <br />" <br /> <br />Parcels at 251 174th Street and 17600 N. Bay Road, Folio No. 312211010- 3870, 2700, 2140, 3390 and <br />Folio No. 312211038- 0220,0360,0270, 0780, respectively, <br /> <br />In both alternatives C and D, there will be a need to inspect the existing seawalls and determine the best <br />way to perforate the seawalls. We have done this in several recent projects including our SR A 1 A where <br />we permitted 6 new outfalls to the Intracoastal Waterway. One issue we will coordinate closely is the <br />maintenance of traffic to minimize impacts to the existing residents and businesses. We have on staff <br />several FDOT trained and certified members for the preparation Maintenance of Traffic (MOT) Plans. <br /> <br />4. DESIGN/OPINION OF PROBABLE COSTS/SPECIFlCA TION <br /> <br />RJ Behar has prepared designs and construction documents for numerous drainage improvements projects <br />for South Florida municipalities such as: City of Miami Beach, City of Hialeah, City of Miami, City of Fort <br />Lauderdale and Town of Davie. Our Stormwater Department provides the services necessary to complete <br />designs and construction documents, as well as permit services required on this project. <br /> <br />DESIGN PLANS <br /> <br />The preparation of the plans will have a design development portion and a final plans preparation portion. <br />The desiqn development phase is one of the most important phases since it establishes all the criteria, <br />concept and scope of the design. We place a lot of emphasis in this phase since a well defined and agreed <br />concept allows for the following final design phases to proceed on schedule. Final plans preparation will <br />follow the City's procedures. Normally a 60%, 90% and Final plans submittals are required. <br /> <br />"I R .J.Behar <br /> <br />R. J. BEHAR & COMPANY, INC. I RFQ No. 11-11-02 I 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.