Laserfiche WebLink
<br />) <br /> <br />MiCOA::AL <br />~.~. <br />:.-- \ \ \ <br />SYSTEMS <br />~ <br /> <br />..,.. Ardarren & Associates, Inc. ([j) I <br />=.::.:..a.::.: C'roochicaJ. EnvirCXlTerla ad HAD 0 N N E <br />~. Mltenas CorIsUtarts <br /> <br />December 2, 2011 <br />City of Sunny Isles Beach <br />Request for Qualifications <br />Civil Engineering Services to Design <br />Street and Drainage Improvements <br />RFQ No.: 11-11-02 <br />Page 8 <br /> <br />Coastal Systems' <br />organizational structure <br />is designed for efficiency, <br />cost-effectiveness, <br />design optimization, and high <br />production throughout all <br />phases of project <br />implementation. <br /> <br />) <br /> <br />Roadway Components - the design will maintain the crown <br />elevation and grading as much as possible, and the storm water <br />improvements will be primarily underground. Coastal Systems <br />has planned and designed roadway protection and restoration for a <br />variety of projects for municipalities including City of Miami <br />Beach, City of Dania Beach, and City of Miami. Pavement <br />restoration will be minimized, to the fullest extent possible, to <br />avoid costly pavement overlays. <br /> <br />Permitting - regulatory permitting specialists are on staff at <br />Coastal Systems and work closely with the engineering team to <br />confirm the agencies that have jurisdiction over the project. This <br />project will require an Environmental Resource Permit (ERP) for <br />the proposed drainage improvements. This permit is based on the <br />SFWMD guidelines, and this agency will likely have jurisdiction <br />unless Miami-Dade PERA will process the ERP under an <br />operating agreement with PERA. In addition, a Class 2 permit is <br />required from PERA for any proposed outfalls. <br /> <br />Easements - the design will be optimized to remain in the public <br />Right-of-Way, however if necessary Hadonne will provide the <br />easement surveys for Coastal Systems to prepare easement <br />documents. Coastal Systems will work closely with the City to <br />coordinate these easements with the propelty owners for the <br />required underground improvements. <br /> <br />Corporate Office: 464 South Dixie Highway. Coral Gables, Florida 33146. Tel: 305.661-3655. Fax: 305-661-1914 <br />Regional Office: 2047 Vista Parkway, Suite 101. \'(lest Palm Beach, Florida 33411 . Tel: 561-640-1003 . Fax: 561-640-1009 <br />\VWW .coastalsvstemsint.com. info@coastalsystemsint.com <br />