Laserfiche WebLink
<br /> <br /> <br /> 1 <br /> 1 <br /> rl Relevant Experience <br /> rl <br /> ~ J <br /> r 1 <br /> ~ 1 <br /> F I <br />I <br />i : I <br />I : J <br />I <br /> ~ ] <br /> r I <br /> l J <br /> < I <br /> . I <br /> <br />, I <br /> <br />l J <br /> <br />, J <br /> <br />, J <br /> <br />FDOT - DISTRICT SIX General Engineering Consultant <br />Florida Department of Transportation - District Six <br />Completion Date: Ongoing (Estimated March, 20012), Project Budget: $8,225,000 <br />General Engineering Consultant performing a districtwide range of engineering services to assist the <br />Department in bringing to completion the production of numerous projects within the District's work <br />plan, Services include Program Management, PD&E studies, final design, drainage design, construction <br />engineering and inspection services, design and right-of-way surveys, and plans review, <br /> <br />DISTRICTWIDE MISCELLANEOUS PE Design Consultant <br />Florida Department of Transportation - District Six <br />Completion Date: October 2009. Project Budget: $1,000,000 <br />The general objective is to perform engineering services required to prepare a set of contract plans <br />to be used by a selected contractor and include project elements for roadway, signing and pavement <br />markings, signalization, lighting, landscaping and right-of-way services for the Department. Consul- <br />Tech will provide design, drainage analysis, design and right-of-way surveys, environmental services, <br />field investigations, geotechnical, utility adjustment plans, signalization, structural, lighting and <br />landscape plans for roadways, structures, minor bridge design, intersections, and interchanges, <br /> <br />S.R. 874 KILLIAN PARKWAY Engineering/Design <br />Miami-Dade Expressway Authority <br />Completion Date: November 2007 Project Budget:$94,000,OOO <br />Project includes modification of the Killian Parkway Interchange with an addition of a separate <br />westbound Killian Parkway to s.w. 107th Avenue ramp over State Road 874, widening ofthe southbound <br />- S.R, 874 bridge and ramp to northbound s,w. 107th Avenue, provisions for new northbound and <br />southbound mainline toll plazas and noise abatement walls to include reconstruction and/or widening <br />of the mainline S,R, 874 between north of s,w. 117th Avenue to the south side of the structure over <br />Kendall Drive, The project included roadway, bridges, building structures, toll facilities, intersections, <br />interchanges, geotechnical services, surveys, drainage, signing and pavement markings, signalization, <br />lighting, utility coordination and relocation, landscaping, maintenance of traffic/traffic control, cost <br />estimates, environmental permits, public involvement, noise abatement analysis, specifications and all <br />necessary items for a complete design, <br /> <br />