<br />FDOT - DISTRICT SIX General Engineering Consultant
<br />Florida Department of Transportation - District Six
<br />Completion Date: Ongoing (Estimated March, 20012), Project Budget: $8,225,000
<br />General Engineering Consultant performing a districtwide range of engineering services to assist the
<br />Department in bringing to completion the production of numerous projects within the District's work
<br />plan, Services include Program Management, PD&E studies, final design, drainage design, construction
<br />engineering and inspection services, design and right-of-way surveys, and plans review,
<br />
<br />DISTRICTWIDE MISCELLANEOUS PE Design Consultant
<br />Florida Department of Transportation - District Six
<br />Completion Date: October 2009. Project Budget: $1,000,000
<br />The general objective is to perform engineering services required to prepare a set of contract plans
<br />to be used by a selected contractor and include project elements for roadway, signing and pavement
<br />markings, signalization, lighting, landscaping and right-of-way services for the Department. Consul-
<br />Tech will provide design, drainage analysis, design and right-of-way surveys, environmental services,
<br />field investigations, geotechnical, utility adjustment plans, signalization, structural, lighting and
<br />landscape plans for roadways, structures, minor bridge design, intersections, and interchanges,
<br />
<br />S.R. 874 KILLIAN PARKWAY Engineering/Design
<br />Miami-Dade Expressway Authority
<br />Completion Date: November 2007 Project Budget:$94,000,OOO
<br />Project includes modification of the Killian Parkway Interchange with an addition of a separate
<br />westbound Killian Parkway to s.w. 107th Avenue ramp over State Road 874, widening ofthe southbound
<br />- S.R, 874 bridge and ramp to northbound s,w. 107th Avenue, provisions for new northbound and
<br />southbound mainline toll plazas and noise abatement walls to include reconstruction and/or widening
<br />of the mainline S,R, 874 between north of s,w. 117th Avenue to the south side of the structure over
<br />Kendall Drive, The project included roadway, bridges, building structures, toll facilities, intersections,
<br />interchanges, geotechnical services, surveys, drainage, signing and pavement markings, signalization,
<br />lighting, utility coordination and relocation, landscaping, maintenance of traffic/traffic control, cost
<br />estimates, environmental permits, public involvement, noise abatement analysis, specifications and all
<br />necessary items for a complete design,